I've always suspected this to be a rather unique point. The limits of the UK's infrastructure limited train lengths for both freight and passenger trains, thus creating demand only for locomotives that could pull those trains, as the UK has always been... let's just say reluctant to upgrade infrastructure. So, by all accounts, by 1935 the UK had reached its practical limit in terms of locomotive size, thus leaving room only to improve designs of those sizes.