Jump to content
 

Red Fox

RMweb Gold
  • Posts

    298
  • Joined

  • Last visited

Posts posted by Red Fox

  1. Good luck getting the PCB out on the NSE one. You need to remove all the glazing to allow removal of the luggage racks so you can get the PCB out.

     

    I'm pretty happy with my new models though not convinced the cab face is right.  I've unclipped the new wider gangway piece and the door is moulded proud of cab face but not by much. Still no where near where it should be but an improvement on the original version.

    • Like 1
    • Informative/Useful 1
  2. I have two of the DRS examples. Both were tested with DCC Concepts Rolling Roads and a Gaugemaster Combi providing the power.

     

    37602 had a couple of instances of the surging as described above during running at about 40% power after about 30mins.  I increased this up to 60% to see if would reoccur at higher power and it did at random intervals but they surge seemed to last a shorter time.

     

    37606 was tested in the same way and experienced no issues.

     

    I've installed Accurascale Lokpilot in both but apart from a quick run  to confirm they work I haven't had much of a chance to give them a proper DCC run.  When I get the chance I'll stick 37602 back on the rolling road but with the DCC controller and it's beefier power supply and see how it fairs.

  3. Apologies if it's somewhere in the previous 269 pages.  Is there  a function list somewhere for the Accurascale Lokpilot sold specifically for the 37?

     

    The function list included with the loco is for the sound version and no info with the decoder or on the Accurascale site. My ancient Lenz Set 100 has only managed F0 directional lights so far and that's with the microswitches set as per the instruction card

  4. The indicator panels are printed, they can't change colour, a white LED just back lights them in direction of travel though you can have both on for light engine moves which it sounds like is the way yours is set up.

    • Like 1
  5. On 16/10/2022 at 14:49, Stan68 said:

    This may be very late as this is four years ago since you asked and you may have already found a solution, but there is a specific Class 166 lighting kit now available from Track3D that looks good. 

     

    https://www.track3drailwayparts.store/products/class-166-lighting-kit

     

     

    I've used this to update my FGW Neon 166 and a 165 conversion and they work really well and are very easy to install.

     

    I'm also in the process of updating my NSE ones to WIPAC lighting clusters from Track3D which require a little more effort, needs a hole drilled for the marker lights and head taillight holes opened up a bit but the result is far superior than the original Bachmann LED's.

    • Like 1
  6. The undeframe detail clips in to the chassis, the only thing that can make it difficult to swap between centre and end coaches is how much glue the person who assembled it decided to use which varies between either the bare minimum and excessive and nothing in between!

     

    The bogie frames also clip on so the ones with the couplings can be easily swapped round.  I've never had any trouble with 170 bogie frame clips but the ones on my 158's regularly break so one does need to be careful.

    • Like 1
  7. On 17/03/2022 at 20:42, phil-b259 said:

     

    Its worth noting that last year P&O wanted to put in place a 'code share' scheme with DFDS allowing P&O to cut the number of ships they needed and generally shrink their Dover - Calais operation.

     

    They were very clearly told NO by the UK competition authorities who said it would create a near monopoly on the Dover - Calais route...

     

    ....maybe this is DP Worlds response to the UK Government!

     

    They actually were running the 'Space Charter Agreement', probably right up until the ships were ordered to remain in port this morning.

     

    The agreement is under investigation by British and French authorities but no action has yet been taken.

     

    On 17/03/2022 at 21:19, burgundy said:

    Out of interest, do we know whether Irish, French and other mainland European staff have been treated in the same way?

    Best wishes 

    Eric 

     

    Dutch Contract Officers and Crew of P&O Ferries were also made redundant today Correction - Jersey contracts onboard the Dutch registered ships were made redundant and were marched off by private security, Dutch contract crew remain. .  Shore based staff remain under contract.

    • Agree 1
    • Interesting/Thought-provoking 1
  8. On 08/07/2021 at 14:23, phil_sutters said:

    At 143m the Newhaven ferries are among the smallest on the cross-Channel routes......There are only a few metres at either end as the bow-thrusters turn them.

     

    Zero metres down aft as they land the stern on some heavy duty fenders and have lines out to help swing her in the Harbour.

     

    https://www.youtube.com/watch?v=C4kQ7-hbKZI

     

    The port is so restrictive the can't even have the ferry berth parallel to the quay as they need to be at an angle for the bow door to line up with the linkspan so there is a Yokohama fender down aft keeping the stern off the quay.

    • Informative/Useful 1
  9. Rolling stock update.

     

    Latest completed projects are for the early 00's fleet. I've now finished what will probably be my last Hornby VEP project (unless I find another cheap one!) and this one is South Central 3822.  As with my previous Hornby VEP's I've rebuilt the front end, replaced the ventilators and horns and removed the solid First Class corridor bulkhead. As this is a 423/8 it only has First Class at one end, the other is open throughout as I've removed the corridor and the compartment bulkheads. Window bars have been fitted on all the passenger doors as per the prototype. I've also replaced the wheels on the trailer bogies with better free rolling ones with bearings to improve running.

     

    vip1.jpg.d5d84a13f64c3fee00dbb5019387e0a1.jpg

     

     

     

    The South Central transfers are by Britannia Pacific Models applied with a lot of Microsol to sit over the hinges and door frames.

     

    I chose 3822 as I found pictures of it at Southampton, a 4-VIP was a slightly easier project than a standard VEP and I wanted one with South Central branding which is how I remember seeing them.

     

    vip2.jpg.5d1256c4c80683b8ff3244ad3a66f833.jpg

     

    While I had the airbrush set up and the appropriate colours I also made a Thumper centre coach from Replica Railway parts.  I haven't sorted the couplings and the through wiring on this yet.

     

    205c.jpg.88e3373dd3ff15304dcd4d5a542ac491.jpg

     

     

    Current big project is the VEP's replacement. An Electrostar 377/4.

     

    377a.jpg.8665dd96a2e87be528687370d942e167.jpg

     

     

     

     

    This is a cut and shunt Bachmann Turbostar with 3d printed cabs by CMAC Models which are available on Shapeways

     

    https://www.shapeways.com/product/MDAK258QN/late-model-electrostar-cabs-x2-00-gauge?optionId=206768682&li=shops

     

    I've finished the body shells on all 4 coaches and I'm just correcting the final faults and making the cab air con pods before progressing to the painting stage.  Since these pictures were taken I've removed the hump in the middle of the air con pods as Electrostars don't have these.

     

    377b.jpg.c358aa8dde5f66cad503ab1b7093272a.jpg

     

    1 chassis out of 4 is ready, the other 3 are stripped down ready for chopping up.

     

    I was making pretty good progress on rolling stock and the layout but this may shortly come to a grinding halt as while typing this I was offered a job so my focus will be on that for a bit.

     

     

    • Like 13
  10. Bit of a long shot but I'm converting a Bachmann Turbostar in to an Electrostar and my unit doesn't have the Cab Air Con pod on the roof.
    Does anyone have a spare roof or part of roof that has the cab air con pod?

     

    EDIT - going to have a go at it myself using a plain roof.

     

     

  11. On 11/09/2020 at 18:53, njee20 said:

    Silver white all over, Railmatch and Phoenix both do it. Not silver grey. 

     

    Been looking on both websites and the only silver white I can find is Phoenix Great Western Trains Silver White(P242), is this right colour or is there an NSE specific silver white? Or are Phoenix calling it NSE white (P178)?

    • Friendly/supportive 1
  12. There should be a major difference in performance as the original has problems with trailer car bogies derailing on curves as the bogies moulding couldn't clear the body.  Sets that had this problem needed to be modified by Hornby with a thin plastic washer that lifted the body slightly, see the 800 topic on the Hornby are of the forum for more info.

     

    Subsequent sets shouldn't have any issues.

    • Thanks 1
  13. Two more rolling stock projects for Ampton are now complete.

     

    150001 in First Great Western livery. A minor disaster occurred when I was putting the cab moulding back in and one of the joins cracked but this was rectified and the unit is now ready for service.

    150001finished.jpg.ffe4e9a7a2fa3bcae98075ee6900659c.jpg

     

    SWT 4-VEP 3417 Gordon Pettitt.  This originally started life as an NSE example and has had quite a bit of work carried out on it to look more like a VEP than an out the box Hornby model. This included reworking the cab face, removing the solid First Class corridor bulkhead and replacing it with one with windows, turning the non-powered bogies the right way round and replacing the malnourished vents and horns.  It joins SWT branded NSE 3415 which has also been modified and a Connex example will follow in due course.  I'm considering drilling out the axles boxes and putting bearings in and replacing the wheels on my three VEP's to improve running, that is why the axle caps aren't yellow yet.

     

    3417a.jpg.526321c18588da7481803bd672adc86f.jpg3417b.jpg.9dbbfb8b449791258f48e768c6cda502.jpg

     

    Other projects in the pipeline are Gatwick Express 488/2, 488/3 and GLV even though they are out of area for my layout setting, a SWT 442 and 4-BEP to finish plus the layout itself.

    • Like 9
  14. Been a while since the last update and there has been some slow progress on the layout since last time.

     

    Scenery wise the tunnel mouth is done. It may not be a perfect match colour wise but it's firmly in the good enough category!

    tunnel.jpg.7f77ad6f480c04ce1788fa18d78cff5a.jpg

     

    Signals facing away from the tunnel work and are CR Signals heads, ones facing the tunnel are Knightwing dummy heads. Signage for the gantry will be added.

     

    tunnelgantry.jpg.a2920aa21f8c6d7c98192b912782331e.jpg

     

     

     

    Eight out of ten baseboards are more or less done.  Scenic length is around 15 feet as is the fiddle yard area, each area is made up of three roughly 4x2 boards and one 3x2 board.  The boards will receive extra cross members for strength and to prevent warping once the electronic layout is finalised.   All that is left to do is a pair of 6 foot long boards that join the scenic area to the fiddle yard to complete the roundy roundy.  One will have some city scenes above track level to make use of the space.  I'll get on with them when I can get some screws, don't think a trip to B&Q for them is an essential journey!  The boards are seen below with some random members of the fleet for scale...

     

    scenicboards.jpg.f553b4f5c3bef87d0e898976d0980264.jpg

     

    fiddleyardboards.jpg.b34b9ddbfd3bc317defcf38229c97188.jpg

     

    Stock wise since last update I've added a pair of 165's to the fleet for the Ampton Central - Reading service, one for each of my modelling era's.  A Thames Trains one and a FGW Neon, they have had their roof vents modified, extra window added on one coach and more hopper windows.

     

    165nse.jpg.8530b50beee8ce7db8d6b055da3e675e.jpg

     

    165125.  Since that picture was taken I have corrected the window frame colour so it is consistent along the unit, I used the wrong shade of grey initially. 165125 is the first piece of rolling stock that has Ampton Central displayed on it's destination board at one end, the other shows Reading.

     

    165FGW.jpg.1b778ca568e7b9468701873e87f34cfb.jpg

     

    165132, I'm considering spraying a lighter blue along the top of the coach side to improve the Bachmann paint job.

     

    My new and improved 150001 has finally made it to the spray booth and as of today has had its yellow ends sprayed on.  It is a cut and shunt of Bachmann 150/1 and 150/2 parts. It will be painted in FGW livery.

     

    150001primed.jpg.a9b5103a8794732d2bc4d34ea129dcab.jpg

     

     

     

    And last but not least for today the 442 has also been making progress, here is a shot of the TSW in its first coat of primer to pick out any issues, of which there were a few. The 442 will be painted in SWT Swoosh v1.

     

    442tsw.jpg.1178e3590c51a256dbaa75ec092e517a.jpg

    • Like 12
  15. A Ukrainian company called BPK (Big Plane Kits) do the 737-200, CRJ-100, 200 and 700 and soon the 737-800 in 1/72 scale.

     

    Welsh Models do the A320, 737-100, 200, 700 and 800, BAE 146-200 and DC-9 also in 1/72 scale.

     

    All quite expensive kits.

     

    Southampton Airport and the South Western Main Line are in close proximity to each other with various buildings parallel to the line and the terminal building a stones throw from Southampton Airport Parkway station, somewhere to look at for inspiration maybe?

  16. 3 minutes ago, DRS Crewe On A Mission said:

     

    Thanks for posting the reply. I really appreciate it. It's good to know that for those who wish to have the loco/s sooner then they can still opt for this option. I might still wait and see what additional loco/s arrive in December with the main batch, thus I won't buy any for the earlier air freight delivery. Which of the 66s were you interested in? Their are three Freightliner examples that interest me but I wouldn't be able to afford to buy those three, plus any new additional models that interest me when the main batch arrives in December. 

     

    You're welcome.

     

    I'm interested in GBRf 'Sarah' and the BR large logo one.  If they are good I'll consider getting a Freightliner one to replace my Bachmann version.

    • Like 1
  17. On 17/10/2019 at 00:23, DRS Crewe On A Mission said:

    The only thing I can think to do is to call or email the shop as Dave at Hattons can't be private messaged on here.

     

    Email from Hattons says:-

     

    There is a deadline as to when we can offer the Airfreight option but at the moment this date has not been confirmed. We will advise customers before the deadline is coming up but you do still have a couple of weeks minimum as to when that will be.

    • Thanks 2
×
×
  • Create New...