Jump to content
 

Markmiller2008

Members
  • Posts

    620
  • Joined

  • Last visited

Everything posted by Markmiller2008

  1. Hi All Finally got my hands on my 56019 late last week after a bit of a mare with it arriving. It is simple superb! One quick question and I feel I may already know the answer to this, having seen a photo of a factory fitted sound one, the screw holes on chassis are for the Speaker retaining bars. Now I'm fitted my own sound to the loco with the ESU Speaker that comes in the sound fitted ones and just wondered if the retaining bars for the speakers will be available as a spare? Great job though guys on the loco. Mark
  2. Southgate Park had two successful (with some slight issues) end of 2023 shows at Showcase and Redditch. Those of you at Showcase will have hopefully seen our sunday open day, photo below for fun. Since Showcase i carried out a quick job on one of the fiddle yard boards, with Southgate Park having changed a little bit with the removal of DMU services, our shuttle sidings were no longer needed. We have extended three fiddle yard boards to allow some down trains to run in longer formations, Relatively easy job with removal of three points and plain lining with flexi track. We carried out a relay of the final part of the LUL section as we found the LU stock wasn't running very well over it, at Redditch we ran our first 62 stock train back and forth! We have a busy 2024, starting with a very last minute addition to the show list on the 14th Jan with some familar DEMU faces operating the layout. List of shows below. Sunday 14th Jan- Burnham and District MRC exhibition, Weston Super Mare https://bdmrc.co.uk/14-january-2024-exhibition/ 22nd/23rd June- EXE MRS Show, Exeter 17th/18th August- Loughborough Model Railway Exhibition 2nd/3rd November- Spalding Model Railway Exhibition. 2025 will reveal an exciting plan, i won't say any more yet but prepare for a difference! Mark
  3. DMU Group (West Midlands) Five Car Restoration Fund The DMU Group (West Midlands) is pleased to announce an exciting new fundraising campaign which aims to raise £100k to cover all planned works to return the 5 car 1950s/60’s Diesel multiple units to full working order including a full repaint. JustGiving Page https://www.justgiving.com/campaign/svr-dmu Back Story. The DMU Group (West Midlands) was formed on the Severn Valley Railway in the 1990s, since then it has maintained and operated a 5-car DMU on the railway. During this time it was regularly used for day-to-day diesel turns, evening fish and chip trains, Christmas carol trains, and featured at diesel gala events. Due to some major overhaul work required including door locks, bogies, and engines which were exacerbated by the effects of the Covid pandemic, the DMU has not been available for service since 2018. However, thanks to a dedicated small team of volunteers who have continuously been at work on the units. The return to service of a 2-car DMU is hoped for by Winter 2023, with a staged plan to return the other 3 cars into traffic in the near future. At a time of increased fuel costs, the 5-car DMU is a vital asset to the SVR. Powered by Leyland 680 engines and weighing around 28 tons per vehicle, it gives high fuel efficiency, with a high passenger capacity equivalent to 6 mark 1 carriages, including disabled access, toilets, and bar facilities. With the unique feature of panoramic views of the Severn Valley. In June 2023 the group received confirmation of their registration as a Charity – number 1203594. In becoming a registered charity the Group gains the official oversight of the Charity Commission protecting our assets for the benefit of the public and ensuring that the Group's fundraising income is spent on the preservation and maintenance of the Group's DMU. Thus giving donors confidence in where their money is going and allowing the Group to benefit from Gift Aid which can enhance donations by 25%.
  4. Well the layout is certainly taking pace ready for its attendance at DEMU Showcase in two weeks time. One thing I was keen to add after removing the crossover was a signal box and that was definitely the right decision to make, a trip to my local model shop to collect our Prefab signal box and now we have something that looks very much like Woking. Shane has worked on the signals to repurpose them on the new track layout, these are Tom’s orignals just slightly rebuilt. The retaining wall replacement is now 99% complete, just a few little touches to finish off. Hopefully some exciting developments will be announced soon. Watch this space
  5. Shane and I had a layout day on Tuesday, with the aim of reducing the amount of jobs still to do before DEMU Showcase which is our next outing. We started off with finishing the base work for the new retaining wall, this will be clad this weekend all being well. Then moved onto the next stage of the platform 4 works, the sides and plasticard tops being done. I’ve since started to paint it, more coats required. Shane fitted the third rail which is pretty much complete on the mains, just the new platform area to finish. Shane’s working on modifying the signalling gantries etc to suit the new changes and is still working away on stock for the layout too. Next job we’re hoping to get done will be the testing of the LUL section, this “may” be operating at Showcase if all is well.
  6. We’ve been busy already since Doncaster. Part of our rolling improvement plan to keep the layout in as best of condition as possible for the foreseeable has seen us crack on with an area I wasn’t too happy with. Since we’ve had the layout the retaining walls below the Royal Mail building and opposite the sidings have been getting worse. So yesterday with the help of Shane, we removed the whole area for replacement. This will be a fairly simple job to complete, also gives access we need to get the LUL running. However what we’ve also started (well I have today) is removal of the unused crossover directly at the end of the platform. Our plan here is to ease out the curve and shorten the platform by half a coach length thus making the operation of the layout a bit easier with smoother curves. As you can see from the second photo, the prep work is nearly done, just new cork, track and ballast to complete. Mark
  7. Last week we finished off the relay, fitted the 3rd Rail and the AWS ramp on the Down line, Up Line still needs one painting and popping in place. Hopefully there will be some additions to the LUL detailling in the next couple of weeks, Timb3D have produced new cable bridges and cable runs which will vastly improve the look of that area, hopeful to have these added by the time Doncaster comes around. The LUL will remain trainless for another show as we just havent had the time to sort it, Showcase may well see that up and running, time will tell. Looking forward to Donny in three weeks time with a guest operator getting us out of the doggy dos as we were looking rather low on operators. Mark
  8. A Month Today is The Doncaster show Lots going on behind the scenes. We tackled the trackwork relay last week, which we (Shane) thought would be an easy job. New cork underlay, track down and ballasted. However when we placed new lengths of track out we could see that one board had a very obvious sag in it. In the space of around 200mm there was a 4mm difference in the levels. To put that into context, if scaled up to full size that would equal a fall of 1ft in approximately 50ft distance. Fortunately we had sufficient cork of various thickness so we could pack it where required. It was weighted down and given 24 hours for the glue to set fully. This gave the new track enough support. All ballasted just some finishing weathering and new 3rd rail to be fitted. Just confirmed is our third show this year in September at Redditch. Mark
  9. Monday night me and Shane took out the roller coaster track in the station area which had been causing some issues. By doing this it will reduce the number of joints in the track which will aide the running of the layout in that area as well as removing the bumps that had occurred from the cork lifting. The plan is to relay and reballast with weathering being carried out in stages to look like it’s a replacement that’s just happened, can anyone help with what Speed restriction boards (Commencement and termination) would have looked like for our timeframe? Mark
  10. We’re still here in the background at a slower pace than usual. We have two confirmed bookings for 2023 and one more which we’re waiting to hear back from. The first of these is the Warners Show at Doncaster in February and we’re making some improvements to the layout ready for then. First of the layout has been reduced in height, at Stafford we felt sorry for a chap in a wheelchair who must have really struggled to see the layout, some advice from Mick Bryan at Warley and an early December work day saw the chop being taken to all the layout legs. Next job which we’re doing and would have already started if not for the arctic temperatures last week is, in the station platform area there’s a bit of a ski jump due to the cork and age having some effects on the track work. We shall be taking the area back to the baseboards shortly for new cork, track and ballast. Shane’s been working hard on another Plastic Pig (Class 442) to complement the one he’s already done. After Donny, we will look at some other improvements, maybe including getting the LUL operational for 2023 show number two which will be DEMU Showcase. Mark
  11. Evening all Over the weekend we had a pre Stafford layout test, we’ve made some reliability tweaks with some autofrogs being added instead of manual microswitches on point frogs and some general improvements to other bits too. With the exception of the BRM Shoot with Andy and Phil the layout hasn’t been up in its entirety since Statfold. We were pleased that as soon as we connected up the layout there were no shorts, one dead section from a loose wire and a couple of point decoder changes were the only issues. Looking forward to a good show to close off the 2022 calendar for us and we then will look forward to a busy 2023.
  12. Well we are still here, the layout has apart from brief trip out (more of that shortly) been in its crates since we returned from Statfold in April. At Statfold we were approached by Phil Parker of BRM, a few months later at a photoshoot later, Southgate Park features in the current (Sept) issue of BRM. On the back of this we also received our first confirmed invite of 2023 to Doncaster by Warners, two other shows are in the pipeline too just waiting on paperwork before we confirm these however another one is a high profile show. Back to the layout, in preparation for its next outing at Stafford in September we have identified some reliability mods to the layout, autofrogs replacing the manual and constantly failure microswitches for the point frogs, point frogs on the scenic board to be wired into our DCC Concepts point decoder and a set of legs for the one corner board that was missing some which caused some issues at Statfold. Stock wise, Shane is working on a refurb of his 5WES Class 442 that he built a number of years ago, new cabs and a repaint is on track for an appearance at Stafford. Mark
  13. Well given that Shane (wolf27) is an expert in all things RTC and has a RTC coach in those colours, i'd think that Hornby are basically making things up
  14. We're off to Stafford in September should anyone want to see the layout in the flesh. Hopefully some new additions to appear for that if @Wolf27manages to get them done! Mark
  15. A quick trip to our local model shop earlier this for supplies and the remaining two buildings for the bridge area were purchased, a few little things to do but essentially now complete. Shameless plug that in just under three weeks time we will be at the new Statfold Barn Model event on the 9th/10th April. Mark
  16. Layouts as follows Hornby Magazine's recently completed ‘OO9’ layout Fairlie Syniad Da and ‘OO’ gauge Great Central Railway inspired Quorn Magna, Duxbury (‘OO’, BR 1960s) Southgate Park (‘OO’, BR NSE) Hackworth (Jutland St.) (‘OO’, BR 1950s) Halland (‘OO’, BR 1960s), Middle Elmton (‘N’, BR 1960s) Merstone and Ventnor West (‘OO’, Isle of Wight) Crewe Gresty Bridge (‘OO’, contemporary) Medway Quay (‘O’, 1950s) Ridge Lane (009) Coleford (009) Tryffan Ddu (009) Tanybwlch (009) Campbell’s Quarry (16mm:ft). Traders as follows Dave Angell Trains Don Bishop Photography Elaine's Trains Footplate Models Invicta Model Rail Malc’s Models Nick Tozer Books Scale Model Scenery Tony’s Trains of Rugby TTC Diecast Videoscene WM Collectables Obviously this isn't the full list, but just encase anyone wants to make a decision from the list. Mark
  17. There is more info to be posted by Hornby Mag and Statfold over the next few weeks. I was talking to Tony at Tony's Trains yesterday and there's still some ironing out of things to be done. Lets give him and Statfold some credit for organising their first event, will always be the hardest and lessons on info will be learnt if future years take place. Mark
  18. Hi All Since Cradley Heath in October, Shane has had the scenic boards for some "Repairs" (less said the better!), Electrical mods and Canopy work. Photos attached. The Canopies are now permanently on the platforms and have lights added too which will be on at all times when the layout is operating. Electrical Mods has seen the D type plugs between the boards replaced with the old Method that Tom used on the layout in its previous incarnation, my way of trying to make things easier actually made it worse. Now for the good news, Southgate Park is booked for two large exhibitions this year, the first being the new Statfold Barn Model Railway Event on April 9/10th and then the one we are very happy with which has been brought forward to 2022 from our 2023 booking is Stafford on September 24/25th. Mark
  19. Well it’s been a long time since I’ve posted here but with the layout being invited to Sutton Coldfield Exhibition at the end of April it was time for a little refresh on the layout. Gone is the Plate bridge which I was never 100% happy with and in its place a brick span, very much a work in progress currently but getting there as and when I get the motivation. Secondly I was never happy with the station building area and three random shops that looked really out of place, with the shops being donated to Southgate Park and some Wills forecourt shops coming the other way I’ve started on another part to the building to make it look more like a concourse. The express models buffer stop lights have finally been wired up and are now working also. Mark
  20. Are the jumper sockets the same as the ones that are on a Heljan 47 detail sprue? Mark
  21. Progress has been slow this week due to work and life being a bit abnormal. The building is coming along nicely, the main span is painted and weathered with the smaller span being just painted so far. lots of details to come on this over time.
  22. My Custom @JSModels MOD low relief building arrived this week and this evening I started to put some paint onto the bigger part, it’s a long way off being anywhere near finished but gives a great impression of how the finished product will be.
  23. It’s all been a bit quiet recently, all the points are finally installed, wired and point motors working correctly. Now for the part which will progress the layout quite a bit, my custom @JSModels low relief MOD building based on D8 storage hangar at Graven Hill at Bicester MOD has now been cut and will be with me in the next week or so. To have this ready to pop on the Backscene I need to ready the concrete handstanding for it to sit on, which I’ve started today.
  24. Totally different black surround style from what Hornby are doing on 50044 though and only had them for the last three years of traffic.
×
×
  • Create New...