Jump to content
 

apj64

Members
  • Posts

    51
  • Joined

  • Last visited

Everything posted by apj64

  1. Finally taking the plunge OO here we come

  2. Finally started my blog

  3. apj64

    Plan of Layout

    Definitley ambitious It has taken us 15 Months to get to the above stage.
  4. This is the plan of Market Sianborough constructed to date Lower Level Middle Level One of the Stations 'Lewis End' Appears on both parts of the plan for ease of operating
  5. apj64

    Introduction

    This section briefly describes the layout and our goals each area will be described in its own sections eventually This is a large layout under construction in 'N Gauge' in our loft the layout is approximatley 11' X 10' and being built on 3 levels. The Layout is being constructed by Myself (Andy) and my son Cieran (10) Market Sianborough is one of 4 Stations proposed on our Layout and is a temporary name until we get the terminus constructed. Control Control is by DCC using a digitrax unit The layout will semi computer controlled in that most of the points are switched from a computer panel and eventually some trains will be automatic. It is not our aim to have a fully automatic layout as this will take the enjoyment away from controlling the trains. To date we have constructed the lower level and lower fiddle yard trackwork (now relegated to a staging area only) The middle level is 90% completed trackwise and forms a twin continious loop with section of 4 track working. We have this weekendjust completed a new fiddle yard which cuts across the middle of the middle level, This Fiddle yard is of the traverser type and gives much easier access than the original one which is now partially buried under one of the Stations
  6. I will be watching this blog closely as I have new type 08 (from ebay) and it is missing the crank pins on one side.Hopefully through your blog may get a solution to this.
×
×
  • Create New...