Jump to content
 

mozzer models

Members
  • Posts

    2,695
  • Joined

  • Last visited

Blog Entries posted by mozzer models

  1. mozzer models
    one of the jobs this week is a Martin Finney LSWR low roof van kit Dia 1410 & as i do not normally build wagons i have put this build in My Blog
    so far i have got the chassie to a rolling stage & there are 26 parts to it
     
    the build is taking a lot longer than it takes me to build a coach as the kit Can build to any of 3 Diagrams which can have any of 5 brake types & 2 axle boxes so just finding the part takes longer than fitting it
    the one i am building is to dia 1410 fitted with morton brakes & panter axle boxes
     

    001 by Mozzer models, on Flickr
     

    002 by Mozzer models, on Flickr
     

    003 by Mozzer models, on Flickr
  2. mozzer models
    One of todays jobs is building up the radiaters for the 23 & them fitting them
    Well i got them built & fitted
    there when together better than i had expected
     

     

     
    next is to get the body to fit the skeleton then its down to fitting the white metal nose, bonit, windows & cab roof
     
     
     
    This is the last post here for more updates look here
    http://www.rmweb.co.uk/community/index.php/topic/14655-7mm-baby-deltic/
     
     
  3. mozzer models
    heres a line up off the Motive Power i have at the moment for running this layout & Forks Trestle
     
    A Bachmann Railtruck i will be building a new back for the item of rolling stock

     
     
     
    a Backwood Minatures Aerocar

     
     
    a A1 models brass body on a underground Ernie chassie

     
     
    a Branchline Models T Ford railcar

     
     
    a Bachmann Shay

     
    a 2-8-2 tank loco running on a Bachmann UK Austerty chassie I used the boiler from the loco but scratch built a body for this loco

  4. mozzer models
    You may remember Me building a On30 Backwoods Miniatures Aerocar but bust the motor when fitting the prop
     
     
    well i have replaced it with one from a small radio controlled helicopter keeping the radio control so that tha Aerocar now runs am battery power
     
    heres some video
     
    test1

     
     
    test 2

     
    drivers will have fun with this as it will only go one way ;D
     
     
  5. mozzer models
    Here are the 3 sets of 2 GNR coaches now that i have glazed the
     
     
    1st up is the 4mm GNR Howlden 45ft dia277 brake 3rd Built from Bill Bedford etches & 247 Developments parts painted by Dave Studley No's 1605 & 799

     
     
     
     
    2nd is the 4mm GNR 58ft 1in dia121 lav composite built from Bill Bedford etches & 247 Developments parts painted by Dave Studley No's 3074 & 3076

     
     
     
    & last but not least the 3rd is the 4mm GNR Howlden 45ft dia129 Lav composite with luggage Built from Bill Bedford etches & 247 Developmets parts painted by Dave Studley No's 134 & 2946

  6. mozzer models
    Well after soldering 32 parts togetter i have now got a set of bogie frames built
    This build is going to be slow as i have to find & them look at photos of the bit i am building so that i can find the part (no numbering on the etches )
    Well heres a pic or to of the Bogie

  7. mozzer models
    Today I am working on a Steve Beattie Diesel kit of a Baby Deltic with head code box
    the instructions are not warth the paper there printed on
    I will not have to build the skelinton as it was sent to me all ready built
    Today i am working on the bogies & will give a update later
  8. mozzer models
    In todays post i have receved back from Dave Studley 3 lots of 2 GNR coaches i still need to fit the glazing in to them put heres some pics
     
    4mm GNR 58ft 1in dia121 lav composite

     
     
     
     
     
     
     
    4mm GNR Howlden 45ft dia129 Lav composite with luggage

     
     
     
     
     
     
     
    4mm GNR Howlden 45ft dia277 brake 3rd

  9. mozzer models
    Having look at the last lot of photos i have put some palm trees between the truck & church to fill the gap till i get time ti build the wall as the next jobs i have to do is wire this up & put the track links on the other ends of the fiddleyards

     

     

     
     
  10. mozzer models
    well apart from little twecks i have finished work on Calle de la Coronacion till after the CRM show
     
    here are pics of how it stands now

    the mod with out the new buildings with the scenics done
     

     

     

    with the building in place
     

     

     

     

     

     

     

     

     
    well that it for now what do you think
     
     
  11. mozzer models
    well with under 2 weeks till this & Forks Trestle are at the C.R.M show 24th jan crewe heritage center
    well with the kid again at home as the schools closed
    I have glaxed the building & put in the doors as you can see inside i have put some paper planking on the walls
     

     

     
    & heres the 3rd building Ropa Interior del Mundo Terrenal can any one tell me which business this is from the street

  12. mozzer models
    I have been given a part built Module that a member OF CRM now does not have time to finish here are some pics
     

     

     

     

     

     

     

     
    Behind the coaches is a strip of land that i am thinking of putting a row of timber building on
    If anyone has any ideas as to what else i can do to it please say
     
     
×
×
  • Create New...