Jump to content
 

Rob Pulham

Members
  • Posts

    2,786
  • Joined

  • Last visited

Contact Methods

  • Website URL
    http://www.railway-models-and-art.co.uk/

Profile Information

  • Location
    Wensleydale
  • Interests
    Railway Modelling, mainly Loco and rolling stock kit building in 7mm, DIY, Visiting Preserved Railways.

Recent Profile Visitors

2,620 profile views

Rob Pulham's Achievements

5.4k

Reputation

  1. The last week or so has been spent on lots of little jobs that don't seem to change much visibly on the model. The visible bits are the trimming of the cylinder drain pipes and having to rethink how I planned to mount and retain the motor from moving. I also milled a hex on the ends of the front crank pins to replicate the fitting on the prototype. I had initially envisaged that the mtor would sit flat and I did add a nut on to a frame spacer to retain it via a strap around the motor but it wouldn't fit through the hole in the firebox with it in this position. My final solution was to replace the rear frame spacer with one that is removable. This was needed because the large final drive gear on the ABC gearbox wouldn't pass between the gap under the existing frame spacer and the top of the rear frame section. A different motor gearbox combination might not have needed this solution. Now that it's removable, the motor/gearbox can be lifted out for maintenance etc. and the position of the spacer once fitted, also acts as a stay preventing the gearbox from rotating about the axle. Win, win.
  2. Thanks Chaz, I confess that attempting such a thing has been on my to do list for some time but once I thought about the use of piano wire it became really simple even if the brackets were a little fiddly. I am sure that the one that pinged off will be sat smuggly smiling at me in the next few days. Aside from making an insulated drawbar and fitting the sand pipes, that's the construction finished. I need to reassemble it, wire up the motor and test run next before it goes for paint.
  3. The last parts to be made and fitted are the cinder guards that fit on the cab side. Even though they are nickel on this kit, they are very vulnerable and a friend mentioned that he always models them folded back which seems like a good idea. but I was concerned about painting around them. I also had the idea that I would like them to fold in like the real thing and so I decided to experiment with the extra etched frame that David supplies. I cut off the two pegs that fit into holes etched in the cab side and soldered a length of 0.5mm piano wire on the back of the frame. Then I drilled a length of 2mm x 2mm brass angle at the ends and soldered in some filed down brass dressmakers pins which I cut down to fit through the holes in the cab. I then drilled the other leg of the angle to accept the pain wire and once soldered to the cab it folds back just like the real thing. Having got the first one fitted I made up the second. Which I took a photo of. Keen eyed readers will note, that there is only one bracket. Sadly, the second made a bit for freedom as I was shortening the peg after a test fit. So unless a miracle happens I will be making up another.
  4. Today saw the last of the tiny components that make up the cylinder drain pipes made and assembled. I also ended up with a nice little bag of extra nuts. I made six for the operating bar and then decided they were a little big (lengthwise) so I made some smaller ones. Each one is made from 16 individual parts and the valves are a bit of a work of fiction because I couldn't find any clear photos of what is actually under there but they pass muster when compared to the castings that I have in various kits and at least they fit this particular loco. The clips that hold the pipes together are still loose and able to slide along the pipes at the minute until I get them fitted and can determine their final position.
  5. I agree Chaz, Fixing it wasn't that big a deal, what baffled me is that they had been drawn to different profiles, when surely the simplest thing to do would be to copy the first, to create the second? I shared the experience so that if someone else builds the same kit in the future it might not catch them out.
  6. I asked a fellow modeller if he had fitted the cab roof yet, because it too has been yet another challenge to overcome. The reason for the challenge is that the profile of the roof rib visible in the shot of the roof below is a different profile to that of the rear frame of the cab which supports the cab roof at the back. When I first fitted it the front of the roof didn't go anywhere near the front of the cab (it did fit when I first "rolled" it some time ago. To get around the issue I cut a front rib to fit just inside the cab front which brought the front of the roof into the right shape again This left a gap in the middle of the roof at the rear which I filled with solder (just visible in the photo below as is the additional rib at the front of the cab). Not very elegant but it works.
  7. The last items to make for the Princess, are the cylinder drain cocks/pipes. The castings were missing from the kit and I looked at those offered by Laurie Griffin and Ragstone but I wasn't convinced that they were suitable for use on the Princess and decided to make my own. They are not yet complete but this is the first step. The making and alignment of the pipes themselves. I made a jig from a strip of nickel sheet which I milled a series of grooves in. The grooves were milled to suit the etched holes in the bottom of the cylinders with spacing of 10mm and 9mm I milled them using the point of a countersink bit and supported the material with a shop made machinist jack. I did the same on each end of the strip of material to give me a top and a bottom for the jig. The two half of the jig were loosely placed together and the legs of the pipes fed into them and the engineers clamp tightened to hold the horizontal parts together. A small G Clamp and a hair grip made sure that the pipes were vertical to each other and couldn't slip while I soldered them. I wasn't really concentrating when I cut and bent up the pipes and I ended up with enough for two pairs. To compound that minor error I had placed them in the jig the wong way around and I had the 10mm and 9mm gaps the wrong way around. I could have unsoldered them but felt it was easier to cut some more and add these to the spares box. I cut these a little different and left the outflow end of the pipes a bit long to cut down when fitted. Oddly when I put these in the jig the other way around I didn't need the G Clamp, the engineers clamp was sufficient to hold them in place.
  8. Hi Chaz, They might have done, if I hadn't been able to get the heat to the bottom of the chimney inside the smokebox. If that had been the case I would have gripped the boiler/smokebox in the vice and heated the chimney casting before using round jawed pliers under the rim to attempt to remove the casting.
  9. Hi Chaz, Did you happen notice the diagonal line of rivets down the tender of the narrow gauge loco in your first photo? They presumably follow the line of the coal slope but they are anything but in a straight line. It was in residence at Shildon for many years which was where I noted it. If you modelled it of course you would be derided for shoddy workmanship...
  10. Although I had fitted the handrail knobs to the boiler and smokebox earlier last week, I hadn't added those on the resin firebox. This was for no other reason than the superglue was upstairs in the fridge and I thought it easier to crack on with something else and bring the superglue down later. When I did subsequently fit the remaining knobs in place, those on one side were fine but for some reason both on the other side didn't seat properly and the glue set as I was trying to push them home. I tried pushing them in with pliers and gently tapping them but I was very concerned that the resin firebox might crack if I was too vigorous. They didn't stick out by much but I wasn't happy having put so much effort in with re-seating the chimney etc. It was during commode time (a term picked up from an american machinist who I watch on Youtube) that an idea came to me. This morning in between making the end caps for the handrails I plucked up the courage to give it a go. I got a short offcut of the 0.8mm piano wire that I have made the handrails from and put a small bend on one end gripping the wire in a pin vice just in front of the bend. I popped the bent end through the hole in the first offending handrail knob. I chose the one that was furthest in, to try the proposed solution on. Then I connected the negative terminal of my RSU to the piano wire which protruded from the handle end of the pin vice. A quick touch with the probe and a slight twist and the knob thankfully popped free without issue. Buoyed by this success, I repeated the same on the second offending knob and I had barely touched it before it popped out. As a precaution because I was heating superglue/resin I had the extractor fan running at the side of my bench just in case any fumes were created. I was probably being over cautious as the glue just seemed to slightly soften rather than melt. Then it was a simple job to re-drill the holes making sure that the knobs were a loose sliding fit before attempting to apply more glue. It was at this point that I found out why one of them wouldn't seat properly. There was a slight rim around the shank on one which prevented it from seating flush. It wasn't really visible but when I ran my nail across it I could feel the ridge. To save time I swapped it for another one from the stores and both were fitted properly.
  11. Progress over the last few days has been excellent so much so that I have backtracked a little and picked up on a couple of items that Paul has mentioned in the past. The first was to replace the hatch knobs on the footplate with some wire loop examples. The knobs have gone in the spares box and will come in at some point. The next was this comment from Paul, which I completely agreed with as I had been unhappy with the fit for sometime. But, I wasn't sure how to go about rectifying it then, so I slept on it... "Hello Rob, when are you going to sort out the gap between the chimney and the smokebox? Coat on and the door closed very quietly behind me! OzzyO." The (replacement for the kit provided) chimney was cast from a 3D print by Mike Hopkins and Mike had placed his print supports under the bottom rim. I can see why as they would be least likely to be seen on the finished model. However because the casting also had a tube which fits into the smoke box to aid location, it made cleaning up the bottom rim and getting it to fit flush very difficult. This is what it looked like after my initial cleaning up of the remains of the supports Having almost finished the body work, I took the bull by the horns and took the chimney back of back gently gripping it in the vice between two pieces of round bar while applying heat to the inside of the chimney until I was able to ease it off. Although I took photos long the way, I am not going to share how I machined the chimney just yet as I want to use it as part of my an evening with presentation later in the month. This is it refitted to the smokebox.
  12. Having learned metric at school, I suspect that if I had gone into engineering, I too would have had to learn imperial measurements. As it was I became butcher and had to learn imperial weights rather quickly. I am okay with the bigger imperial measurements I just struggle when I get below an eighth. I am much more comfortable working in 10's but I suppose that's where thousandths of an inch come in. I too would have used a scribing block if I hadn't bought the height gauge. Indeed I have used a scribing block to check if parallel boilers were sat level on previous builds but since buying the height gauge I have been itching to put it to good use.
  13. Most people reading my threads regularly, will have gathered by now that I am a bit of a tool junkie and that I don't do well with the smaller imperial measurements. Late last year I came across a Chesterman Height Gauge which measures in both imperial and metric, at a price that I didn't need to sell a kidney to afford. It came in its original box with all the attachments including a holder for a dial test indicator. When I was looking for one, even those with no box or attachments were fetching good money. I already had a good quality imperial Height Gauge which I was able to sell to recoup some of the cost, thus making it a worthwhile investment. For those that don't know, height gauges are used not only to measure and compare heights but also for marking out when machining and they come with at least one hardened tools for scribing. To use it, you cover your workpiece in layout fluid/marker pen and then scribe in your horizontal layout marks with the workpiece and and the height gauge on a surface plate of some sort. Because I didn't want to scribe the boiler, leaving marks that might show through the paint, I thought that I might be able to use the dial test indicator attachment to hold a pencil. Sadly all the pencils that I could find in the house were all the standard hexagonal type which were all too big to fit in the holder. Having a box of brand new pencils to hand I had no problem in turning the end of one of the pencils down to fit the DTI holder. I used a flat ended HSS tool bit and although I have a corrugated way cover I immediately vacuumed the sawdust off the lathe to prevent any staining of the metalwork. I sat the loco on a pair of 1-2-3 block on a sheet of plate glass to do the marking of the horizontal line down either side of the loco. Since taking the photos I have chopped off the thinned down end of the pencil and it now lives in the box with the height gauge as I suspect that over time I will make much use of it for marking boilers.
  14. An Evening With... Rob Pulham View the Event Diary Friday, 26 April, 2024, 20:00-22:00 Online via Zoom Join Rob Pulham who will talk about using lathes and other machine tools to improve kits or replace parts. The event takes place on Friday 26th April @ 20:00 BST. The event is FREE to members or £3:00 for non-members. You must register for this event as places are limited - registration will be open from the 26th March 2024.
  15. After the fitting the firebox and checking the fit of the lower firebox sides with the chassis in place I was wondering how to hold them in position while the epoxy set. After trying and discarding a number of different clamps that I have in the workshop ranging from a small engineers clamp to a pair of 1" G clamps I decided to make a custom clamp to do the job. On my bench I just happened to have a short length of 14mm dowel which would do perfectly for what I had in mind. The bottoms of the lower firebox sides slope so I reasoned that dowel being round would allow clamping along those slopes. Next I cut a short piece of 5mm square boxwood to a length that would sit on the footplate inside the firebox and drilled a hole through the middle. I had planned to use a 1" 10ba screw as I have quite a stock of them. Sadly it wasn't anywhere near long enough so I decided to turn myself a custom screw and to make it a bit easier to handle a longer length in the lathe, I decided to make it 8ba rather than 10 ba. I started with some 3mm brass rod and turning around 10mm at a time to minimise deflection I kept easing a bit more from the collet until I had a 30mm length that could be threaded 8 ba. As I started to run the die down it I realised that I didn't actually need to thread the whole length so I just did about 12mm. As it turned out that wasn't quite long enough either but rather than start again I worked out that I could just counterbore the dowel to allow for enough thread to tighten the clamp. I created the counterbore with a 6mm 4 flute end mill which allowed enough clearance to use an 8ba nut spinner and for me to add a washer. As it was only to hold the parts in place there was never any need for it to be anything more than gently tightened. There is a hole in the upper surface of the lower firebox sides which locates over the studs mentioned in the previous post. The clamp then holds down the rear and to be belt and braces I also placed a reel of solder on the on the flat section at the front to be sure that it sat down flush on the studs and stayed there.
×
×
  • Create New...