Jump to content
 

Rob Pulham

Members
  • Posts

    2,786
  • Joined

  • Last visited

Everything posted by Rob Pulham

  1. The last week or so has been spent on lots of little jobs that don't seem to change much visibly on the model. The visible bits are the trimming of the cylinder drain pipes and having to rethink how I planned to mount and retain the motor from moving. I also milled a hex on the ends of the front crank pins to replicate the fitting on the prototype. I had initially envisaged that the mtor would sit flat and I did add a nut on to a frame spacer to retain it via a strap around the motor but it wouldn't fit through the hole in the firebox with it in this position. My final solution was to replace the rear frame spacer with one that is removable. This was needed because the large final drive gear on the ABC gearbox wouldn't pass between the gap under the existing frame spacer and the top of the rear frame section. A different motor gearbox combination might not have needed this solution. Now that it's removable, the motor/gearbox can be lifted out for maintenance etc. and the position of the spacer once fitted, also acts as a stay preventing the gearbox from rotating about the axle. Win, win.
  2. Thanks Chaz, I confess that attempting such a thing has been on my to do list for some time but once I thought about the use of piano wire it became really simple even if the brackets were a little fiddly. I am sure that the one that pinged off will be sat smuggly smiling at me in the next few days. Aside from making an insulated drawbar and fitting the sand pipes, that's the construction finished. I need to reassemble it, wire up the motor and test run next before it goes for paint.
  3. The last parts to be made and fitted are the cinder guards that fit on the cab side. Even though they are nickel on this kit, they are very vulnerable and a friend mentioned that he always models them folded back which seems like a good idea. but I was concerned about painting around them. I also had the idea that I would like them to fold in like the real thing and so I decided to experiment with the extra etched frame that David supplies. I cut off the two pegs that fit into holes etched in the cab side and soldered a length of 0.5mm piano wire on the back of the frame. Then I drilled a length of 2mm x 2mm brass angle at the ends and soldered in some filed down brass dressmakers pins which I cut down to fit through the holes in the cab. I then drilled the other leg of the angle to accept the pain wire and once soldered to the cab it folds back just like the real thing. Having got the first one fitted I made up the second. Which I took a photo of. Keen eyed readers will note, that there is only one bracket. Sadly, the second made a bit for freedom as I was shortening the peg after a test fit. So unless a miracle happens I will be making up another.
  4. Today saw the last of the tiny components that make up the cylinder drain pipes made and assembled. I also ended up with a nice little bag of extra nuts. I made six for the operating bar and then decided they were a little big (lengthwise) so I made some smaller ones. Each one is made from 16 individual parts and the valves are a bit of a work of fiction because I couldn't find any clear photos of what is actually under there but they pass muster when compared to the castings that I have in various kits and at least they fit this particular loco. The clips that hold the pipes together are still loose and able to slide along the pipes at the minute until I get them fitted and can determine their final position.
  5. I agree Chaz, Fixing it wasn't that big a deal, what baffled me is that they had been drawn to different profiles, when surely the simplest thing to do would be to copy the first, to create the second? I shared the experience so that if someone else builds the same kit in the future it might not catch them out.
  6. I asked a fellow modeller if he had fitted the cab roof yet, because it too has been yet another challenge to overcome. The reason for the challenge is that the profile of the roof rib visible in the shot of the roof below is a different profile to that of the rear frame of the cab which supports the cab roof at the back. When I first fitted it the front of the roof didn't go anywhere near the front of the cab (it did fit when I first "rolled" it some time ago. To get around the issue I cut a front rib to fit just inside the cab front which brought the front of the roof into the right shape again This left a gap in the middle of the roof at the rear which I filled with solder (just visible in the photo below as is the additional rib at the front of the cab). Not very elegant but it works.
  7. The last items to make for the Princess, are the cylinder drain cocks/pipes. The castings were missing from the kit and I looked at those offered by Laurie Griffin and Ragstone but I wasn't convinced that they were suitable for use on the Princess and decided to make my own. They are not yet complete but this is the first step. The making and alignment of the pipes themselves. I made a jig from a strip of nickel sheet which I milled a series of grooves in. The grooves were milled to suit the etched holes in the bottom of the cylinders with spacing of 10mm and 9mm I milled them using the point of a countersink bit and supported the material with a shop made machinist jack. I did the same on each end of the strip of material to give me a top and a bottom for the jig. The two half of the jig were loosely placed together and the legs of the pipes fed into them and the engineers clamp tightened to hold the horizontal parts together. A small G Clamp and a hair grip made sure that the pipes were vertical to each other and couldn't slip while I soldered them. I wasn't really concentrating when I cut and bent up the pipes and I ended up with enough for two pairs. To compound that minor error I had placed them in the jig the wong way around and I had the 10mm and 9mm gaps the wrong way around. I could have unsoldered them but felt it was easier to cut some more and add these to the spares box. I cut these a little different and left the outflow end of the pipes a bit long to cut down when fitted. Oddly when I put these in the jig the other way around I didn't need the G Clamp, the engineers clamp was sufficient to hold them in place.
  8. Hi Chaz, They might have done, if I hadn't been able to get the heat to the bottom of the chimney inside the smokebox. If that had been the case I would have gripped the boiler/smokebox in the vice and heated the chimney casting before using round jawed pliers under the rim to attempt to remove the casting.
  9. Hi Chaz, Did you happen notice the diagonal line of rivets down the tender of the narrow gauge loco in your first photo? They presumably follow the line of the coal slope but they are anything but in a straight line. It was in residence at Shildon for many years which was where I noted it. If you modelled it of course you would be derided for shoddy workmanship...
  10. Although I had fitted the handrail knobs to the boiler and smokebox earlier last week, I hadn't added those on the resin firebox. This was for no other reason than the superglue was upstairs in the fridge and I thought it easier to crack on with something else and bring the superglue down later. When I did subsequently fit the remaining knobs in place, those on one side were fine but for some reason both on the other side didn't seat properly and the glue set as I was trying to push them home. I tried pushing them in with pliers and gently tapping them but I was very concerned that the resin firebox might crack if I was too vigorous. They didn't stick out by much but I wasn't happy having put so much effort in with re-seating the chimney etc. It was during commode time (a term picked up from an american machinist who I watch on Youtube) that an idea came to me. This morning in between making the end caps for the handrails I plucked up the courage to give it a go. I got a short offcut of the 0.8mm piano wire that I have made the handrails from and put a small bend on one end gripping the wire in a pin vice just in front of the bend. I popped the bent end through the hole in the first offending handrail knob. I chose the one that was furthest in, to try the proposed solution on. Then I connected the negative terminal of my RSU to the piano wire which protruded from the handle end of the pin vice. A quick touch with the probe and a slight twist and the knob thankfully popped free without issue. Buoyed by this success, I repeated the same on the second offending knob and I had barely touched it before it popped out. As a precaution because I was heating superglue/resin I had the extractor fan running at the side of my bench just in case any fumes were created. I was probably being over cautious as the glue just seemed to slightly soften rather than melt. Then it was a simple job to re-drill the holes making sure that the knobs were a loose sliding fit before attempting to apply more glue. It was at this point that I found out why one of them wouldn't seat properly. There was a slight rim around the shank on one which prevented it from seating flush. It wasn't really visible but when I ran my nail across it I could feel the ridge. To save time I swapped it for another one from the stores and both were fitted properly.
  11. Progress over the last few days has been excellent so much so that I have backtracked a little and picked up on a couple of items that Paul has mentioned in the past. The first was to replace the hatch knobs on the footplate with some wire loop examples. The knobs have gone in the spares box and will come in at some point. The next was this comment from Paul, which I completely agreed with as I had been unhappy with the fit for sometime. But, I wasn't sure how to go about rectifying it then, so I slept on it... "Hello Rob, when are you going to sort out the gap between the chimney and the smokebox? Coat on and the door closed very quietly behind me! OzzyO." The (replacement for the kit provided) chimney was cast from a 3D print by Mike Hopkins and Mike had placed his print supports under the bottom rim. I can see why as they would be least likely to be seen on the finished model. However because the casting also had a tube which fits into the smoke box to aid location, it made cleaning up the bottom rim and getting it to fit flush very difficult. This is what it looked like after my initial cleaning up of the remains of the supports Having almost finished the body work, I took the bull by the horns and took the chimney back of back gently gripping it in the vice between two pieces of round bar while applying heat to the inside of the chimney until I was able to ease it off. Although I took photos long the way, I am not going to share how I machined the chimney just yet as I want to use it as part of my an evening with presentation later in the month. This is it refitted to the smokebox.
  12. Having learned metric at school, I suspect that if I had gone into engineering, I too would have had to learn imperial measurements. As it was I became butcher and had to learn imperial weights rather quickly. I am okay with the bigger imperial measurements I just struggle when I get below an eighth. I am much more comfortable working in 10's but I suppose that's where thousandths of an inch come in. I too would have used a scribing block if I hadn't bought the height gauge. Indeed I have used a scribing block to check if parallel boilers were sat level on previous builds but since buying the height gauge I have been itching to put it to good use.
  13. Most people reading my threads regularly, will have gathered by now that I am a bit of a tool junkie and that I don't do well with the smaller imperial measurements. Late last year I came across a Chesterman Height Gauge which measures in both imperial and metric, at a price that I didn't need to sell a kidney to afford. It came in its original box with all the attachments including a holder for a dial test indicator. When I was looking for one, even those with no box or attachments were fetching good money. I already had a good quality imperial Height Gauge which I was able to sell to recoup some of the cost, thus making it a worthwhile investment. For those that don't know, height gauges are used not only to measure and compare heights but also for marking out when machining and they come with at least one hardened tools for scribing. To use it, you cover your workpiece in layout fluid/marker pen and then scribe in your horizontal layout marks with the workpiece and and the height gauge on a surface plate of some sort. Because I didn't want to scribe the boiler, leaving marks that might show through the paint, I thought that I might be able to use the dial test indicator attachment to hold a pencil. Sadly all the pencils that I could find in the house were all the standard hexagonal type which were all too big to fit in the holder. Having a box of brand new pencils to hand I had no problem in turning the end of one of the pencils down to fit the DTI holder. I used a flat ended HSS tool bit and although I have a corrugated way cover I immediately vacuumed the sawdust off the lathe to prevent any staining of the metalwork. I sat the loco on a pair of 1-2-3 block on a sheet of plate glass to do the marking of the horizontal line down either side of the loco. Since taking the photos I have chopped off the thinned down end of the pencil and it now lives in the box with the height gauge as I suspect that over time I will make much use of it for marking boilers.
  14. An Evening With... Rob Pulham View the Event Diary Friday, 26 April, 2024, 20:00-22:00 Online via Zoom Join Rob Pulham who will talk about using lathes and other machine tools to improve kits or replace parts. The event takes place on Friday 26th April @ 20:00 BST. The event is FREE to members or £3:00 for non-members. You must register for this event as places are limited - registration will be open from the 26th March 2024.
  15. After the fitting the firebox and checking the fit of the lower firebox sides with the chassis in place I was wondering how to hold them in position while the epoxy set. After trying and discarding a number of different clamps that I have in the workshop ranging from a small engineers clamp to a pair of 1" G clamps I decided to make a custom clamp to do the job. On my bench I just happened to have a short length of 14mm dowel which would do perfectly for what I had in mind. The bottoms of the lower firebox sides slope so I reasoned that dowel being round would allow clamping along those slopes. Next I cut a short piece of 5mm square boxwood to a length that would sit on the footplate inside the firebox and drilled a hole through the middle. I had planned to use a 1" 10ba screw as I have quite a stock of them. Sadly it wasn't anywhere near long enough so I decided to turn myself a custom screw and to make it a bit easier to handle a longer length in the lathe, I decided to make it 8ba rather than 10 ba. I started with some 3mm brass rod and turning around 10mm at a time to minimise deflection I kept easing a bit more from the collet until I had a 30mm length that could be threaded 8 ba. As I started to run the die down it I realised that I didn't actually need to thread the whole length so I just did about 12mm. As it turned out that wasn't quite long enough either but rather than start again I worked out that I could just counterbore the dowel to allow for enough thread to tighten the clamp. I created the counterbore with a 6mm 4 flute end mill which allowed enough clearance to use an 8ba nut spinner and for me to add a washer. As it was only to hold the parts in place there was never any need for it to be anything more than gently tightened. There is a hole in the upper surface of the lower firebox sides which locates over the studs mentioned in the previous post. The clamp then holds down the rear and to be belt and braces I also placed a reel of solder on the on the flat section at the front to be sure that it sat down flush on the studs and stayed there.
  16. I finally took the plunge and fixed the firebox to the footplate In order to do so, I needed to attach the firebox in two planes, to the footplate and to the cab front. I was sure that If I attempted to use adhesive for both it would be a recipe for disaster. In so much as I would end up with epoxy smeared where I didn't want it on either the cab front or the footplate. To overcome this, I made up a plate that fits inside the firebox with two studs in it (1x 10ba and 1x 8ba). They pass through the cab front and are secured by nuts within the cab. They are hidden by the back head when it's in place. Knowing that I could stand the footplate on blocks of wood cab side down and put epoxy on the bottom faces of the firebox print while being able to slide into final position on the cab front made it so much easier. Finally two 12ba screws held the firebox to the footplate while it set. The plan was to remove them and replace them with studs that will screw into the holes and then hold the two lower firebox pieces into place until the epoxy sets on those. Leaving the studs in place will give a degree of mechanical strength to the glued joints too. You can see these studs in the photo above as I took the photos after I had fitted the firebox.
  17. An Evening With... Will Heath View the Event Diary Tuesday, 26 March, 2024, 20:00-22:00 Online via Zoom Join Will Heath who will talk about making buildings with card materials. The event takes place on Tuesday 26th March @ 20:00 GMT. The event is FREE to members or £3:00 for non-members. You must register for this event as places are limited - registration will be open from the 26th January 2024.
  18. The last few sessions at the bench have been spent working on fitting the Silvertown lubricators which I made earlier in the build. After some thought I decided to drill and tap the bases/footplate rather than trying to solder them on. I did this for two reasons 1. They would be removable for painting 2. Being solid brass, soldering them would require quite a bit of heat, potentially disturbing some of the other details fitted previously. I have soldered all the wire tails to a strip of etch to keep them tidy but I may have to revisit the length and position of them once I refit the chassis. I also noted a couple of etched holes in what looks like an inspection panel on the top of the footplate so I turned a couple of small knobs to fill the holes I am not sure how prototypical this is as I couldn't find any photos which showed the inspection panels.
  19. Thanks Chaz, I agree, they are indeed worth the effort. I treat all such frustrations as learning experiences, but it doesn't stop me muttering at the time.
  20. Well, what an absolute beggar making those turned out to be. I have made at least eight or more of these plates before getting the bolt heads in the right place and mounted to the sleeve correctly. Quite embarrassingly, it was for the most part due to my failure to add up correctly when working out the degrees of spacing around the circumference... Still I got there in the end.
  21. It was with some relief that my test fit this morning proved that my efforts had indeed solved the problem. Now I just need to add the missing bolt head detail.
  22. Removing the cast sleeve was a bit of a challenge and I used a combination of a piercing saw, a wood chisel and old files dipped in talc. This did remove the sleeve but it was hard work and left the stub slightly oversized and not remotely round. I decided to make a tool to cut the stub into a regular round shape. I started with a length of steel round bar which I had recovered from an old printer fuser unit that I had replaced. I salvaged all the useful parts which included the bar, several springs and a number of screws. I am not sure what type of steel it is but it's probably the most free machining steel that have used to date. I cut off a short length and faced off the end. Then I drilled a 3.2mm hole in the end. Once drilled I then took it over to the mill where I secured the length of bar in a square collet block. Finally using a bit of trial and error I cut teeth into the rim. The series of photos below show some of the milling process. I had already took a small cut to establish where the teeth would be before thinking to take photos. The opposite end of the rod had a stub turned on it (which it located in the printer). This allowed it to be gripped with ease in a pin vice. It made remarkably short work of truing up the misshapen end of the casting. The next job is to test fit them to the footplate and see if I have resolved the problem.
  23. Plan A is to recreate the flanged sleeve as a separate entity which will sip over the end of the main steam pipe and allow movement to hopefully take up the gap. I started by fly cutting both ends of a piece of nickel bar to the radius of the smokebox. Then, I turned down the diameter and drilled out the centres before parting them off. The backing disks were turned from small squares of 0.2mm thick scrap etch. The disks were turned, by super gluing the square offcuts to an arbor made from the remains of the nickel bar that the sleeves were turned from. I could have used solder to stick them to the arbor but reasoned that super-glue would be easier to get off the finished disks and so it proved. The next job is to remove the cast sleeves from the end of the steam pipe castings.
  24. Guild Spring Show 2024 Date: Saturday, 2nd March 2024 10:00 - 16:00 (09:30 for advanced ticket holders) Location: The Arena. Kettering Leisure Village. Thurston drive. Kettering. NN15 6PB. Price: £10.00 for members and £15.00 for non-members if purchased in advance. £2.00 extra on the door On-line tickets: https://www.gaugeoguild.com/onlinesales/ticketsales.aspx The Show Guide is now available to download in pdf format: Gauge O Guild Spring Show Guide Gauge O Guild Spring Show Floor Plan Layouts booked: BOOKS BRIDGE 2ft.4in. gauge rural electric trams. c.1900 WELLAND MILLS ex-LNER branch line, 1960s QUESTA American narrow gauge in Colorado / New Mexico. On30 PRIORY YARD Small shunting layout featuring a manufacturing plant. STREETON WAY SIDINGS Shunting layout THE WAGON WORKS A micro layout using wagon turntables instead of pointwork. WEEKEND YARD The Guild's own 'Build it in a Weekend' project layout. EAST MIDLANDS TEST TRACK Demonstrators booked: WEEKEND YARD The Guild layout build team LOCO BUILDING Brian Tole ARCHITECTURAL MODELLING Richard Ellis SOLDERING & RIVETTING Rob Bishop COACH BUILDING Robin Taylor WEATHERING 'Arry Dodd PAINTING & LINING Ian Rathbone BUILDING DIESEL & ELECTRIC ROLLING STOCK Dick Dockerill CAD to 3D PRINTED REALITY Nigel Paine Demonstrators: See above Stands: We have 75 confirmed traders for Kettering 1039 Models Ace Products AirFramed Amberly Components Bill Hudson Transport Books Brushes 4 Models Buzz Models C & L Finescale Track Building Systems Ltd Coastal DCC Connoisseur Models CPL Products CRT Kits D & S Models DS Smith Books Dapol Diane Carney Duncan Models Easy-Build Coaches EBMA Hobby & Craft Ellis Clark Fine Scale Brass (UK) Finney7 First Class kits Geoff Stratford Gladiator Gloforce Greenwood Railway Products Haywood Railway HMRS Ian Kirk Models Intentio James Green Artist Judith Edge Kits Lanky Kits LCUT Creative Martin Bloxsom Masterpiece Models Metalsmith (Leeds) Ltd Midland Railway Society Minerva Model Railways MMM (Made in Manchester Models) MMR Models Moorview Models MSC Models Nick Tozer Railway Books Northumbrian Painting Service P.R.Model Railway Products Parliamentary Trains Peartree Engineering Peter Clark Models Phoenix Precision Paints PLM Cast-a-Ways Poppy's Woodtech Premier Components Primo Models Ragstone Models Ray Heard Model Railways SM Models Sanspareil ICS SBT Developments Scorpio Models Shamrock Trains Simon's Sort Out Skytrex Ltd Slaters Plastikard Squires Model and Craft Tools Steamline Ltd. The Paperchase Tim Hughes TMS Models Tower Collection Blackpool Tower Models Walsall Model Industries Walsworth Models Warren Haywood SOCIETIES x 13 are booked MIOG ALSRM Great Eastern Railway Society Great Northern Railway Society 7mm Narrow Gauge Association Scale7 Group Warley Model Railway Club Great Central Railway Society London North Western Railway Society Northampton Society of Model Engineers Severn Valley Railway Telford Steam Railway Nene Valley Railway Driving: Take Junction 8 off the A14. Head towards town. At 1st roundabout turn Rt. into Lake Ave. At next roundabout turn Rt. into Thurston Drive. Leisure Village is on Rt. Stewards will direct you to parking areas. Transport: By Train Kettering Midland Mainline Station is served by trains to & from London/Nottingham/Derby/Sheffield ( East Midlands Railway Inter City, diesels), London St. Pancras/Luton/Bedford (EMR Connect, electrics) A complimentary shuttle bus will transfer visitors to and from the railway station, between 08:30 and 16:30. Walking time to the venue is about 15 min. Exit station, turn left, left again into Northfield Avenue, left under railway bridge and left into Thurston Drive. Follow footpath until it divides, bear left past football pitches. Venue is straight ahead, across road.
  25. The Princess continues to challenge. The replacement for the live steam injector pipe took much tweaking and test fitting before it fit snugly with the chassis in place. Once I got my head around how the pipes ran, the two front oilers didn't present too much of an issue although I had to look at a good number of photos before I worked out where said pipes ran. Next I removed the pin rom the bottom of the steam pipe castings and drilled and tapped them 10 BA so that I could screw them to the footplate through the mounting holes As can be seen from the snips below there is quite a gap between the boiler and the steampipe flange. At the moment I am not sure where the problem lies, whether it's in the placement of the mounting holes, in the dimensions of the castings or something else. Initially I tried turning down some washers to fill the gap but I don't think that's the answer.
×
×
  • Create New...