Jump to content
 

Blog- Kelvinbank, a Caledonian Railway project. - A Dunalastair 1 part 5


 Share

Recommended Posts

I have got on fairly well with some free time over new year. The last difficult bit of the body was getting the roof soldered on neatly and adding the cab handrails. The spectacles were giving me a bit of grief, and awkward thing to form in brass. So I stopped and thought about it. 10 minutes later I had enough to do a fleet of engines thanks to the silhouette. The dome and chimney from the DJH kit fettled up reasonably, safety valve and whistle are from Caley coaches.





 


So next step chassis. Calculate the shims needed, carefully clean and paint the frames first. Rear wheels and gearbox in without problems and nicely square. I sometimes find quartering problematic but this one required very little adjustment. The backscratcher pickups are from my bits box of very small springy contacts taken from old electronics. they actually are double contacts but are only the width of the rear of the flange.






So, put it under the body and stick it on the track. This is where you normally find the coupling rods foul at the top of their travel, but lo, it ran. This is a dry run, not even oiled it yet. A bit grainy wthj me just holding the camera, but it gives the general idea.




Most of the tender is done too, getting there .

Attached thumbnail(s)
  • blogentry-30265-0-82320400-1546612129_th
  • blogentry-30265-0-09088900-1546612154_th
  • blogentry-30265-0-03323600-1546612183_th
  • blogentry-30265-0-59110200-1546612220_th
  • blogentry-30265-0-00219900-1546612243_th


View the full article
Link to post
Share on other sites

 Share

×
×
  • Create New...