mikemusson Posted January 21, 2019 Share Posted January 21, 2019 Model of Chester No 6 Signal Cabin which closed in 1984. The model is entirely scratch built.Category - infrastructure. Period -1974 6 3 Link to post Share on other sites More sharing options...
RMweb Gold beast66606 Posted January 21, 2019 RMweb Gold Share Posted January 21, 2019 Very nice, I assume 1974 is when it was entered ? - the colours of the box and signals are early 1900s. The interlocking is in disarray (as they used to say) as two conflicting routes are showing on the signals. One of my shots from the walkway from the top of the steps to the door, the signal on the right is the same signal as modelled, but now has upper quadrant arms. The one on the left is a complete replacement 2 Link to post Share on other sites More sharing options...
RMweb Premium PaternosterRow Posted February 4, 2019 RMweb Premium Share Posted February 4, 2019 Brilliant. Link to post Share on other sites More sharing options...
Recommended Posts
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now