Jump to content
 

DRS Mk2E escort vehicles


South-East Rail
 Share

Recommended Posts

Hi all,

 

Does anyone have any pictures of/detailed information about the pair of DRS Mk2E BSO escort coaches (9506 & 9508)? Specifically, I'm interested in the internal and external modifications made to these vehicles for their use in escorting MOD nuclear fuel workings. I can only find a few photos on flickr and the internet more broadly (I'm not looking for the older Mk2A pair, 9419 & 9428).

 

Thanks in advance!

 

Ed

Link to post
Share on other sites

  • RMweb Premium

Typing "drs 9506" or "drs 9508" into flickr.com will help with external details.

Or "9508 escort" - but be careful as that will also show a few "bonus" pictures......................

This then leads to the likes of 6C72 and further search parameters.

 

The main external mods seem to be different widow frames and a grille on the side.

As well as removal of corridors as per 9419/9428..

The recent move was 6Z68 - that also throws up a few useful pics of 9506.

 

Youtube videos may show roof details.

  • Thanks 1
  • Informative/Useful 1
  • Funny 1
Link to post
Share on other sites

  • RMweb Premium

Looks like there's a roof exhaust [*]  pause at 1.17

 

 

[*] Which points to an onboard generator - doesn't surprise me as the usual traction doesn't have any form of train heating/power. (Must go back and look at 9419/9428...)

Edited by newbryford
  • Like 1
  • Informative/Useful 1
Link to post
Share on other sites

  • RMweb Gold
6 hours ago, newbryford said:

Looks like there's a roof exhaust [*]  pause at 1.17

 

 

[*] Which points to an onboard generator - doesn't surprise me as the usual traction doesn't have any form of train heating/power. (Must go back and look at 9419/9428...)


I scrolled through the video clip as slowly as I could and in the former passenger saloon, the seating area and tables seems to be still there.  I suppose they do need somewhere to sit and relax when taking a break.

Link to post
Share on other sites

  • 2 weeks later...

I've been doing a bit of work on the first of these coaches:

 

68008 & Escort Coach

 

So far I have:

- removed gangways & plated over ends

- drilled a hole in the roof to represent the generator exhaust

- replaced one end window with a grille

- weathered the underframe.

 

More to follow at some stage!

 

Ed

Edited by South-East Rail
  • Like 8
  • Craftsmanship/clever 2
Link to post
Share on other sites

  • 1 year later...
On 07/10/2020 at 21:24, South-East Rail said:

I've been doing a bit of work on the first of these coaches:

 

68008 & Escort Coach

 

So far I have:

- removed gangways & plated over ends

- drilled a hole in the roof to represent the generator exhaust

- replaced one end window with a grille

- weathered the underframe.

 

More to follow at some stage!

 

Ed

 

Hi Ed, did you ever finish these? If so any chance of a few photos please?

Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
 Share

×
×
  • Create New...