vulcanbomber Posted January 25, 2022 Share Posted January 25, 2022 I have 6 storage loops and one of the loops No. 5 have three blocks A,B,C which can hold up to 3 trains . 1, 2 & 3. At the start all blocks are occupied, then i manually select and move the train 1 out of block A. Then I automatically want train 2 to move into block A and train 3 to move to block B, leaving block C clear. I want this to continue for ever with the trains always moving forward if the next block becomes empty. This is the only piece of automation ,I want on the layout I am just starting to use JMRI and Engine driver to control the layout. It is looking very promising at the moment I have track sensors installed in Blocks A,B,C from the time the layout was fully automated using Rocrail With the advent of Engine Driver I find it more interesting to control most the layout manually, since I no longer need to fixed in one spot in front of the control panel. I imagine I can do with JMRI but haven't any idea how to start. Link to post Share on other sites More sharing options...
ahellary Posted January 31, 2022 Share Posted January 31, 2022 richard yes it can be done but i use train controller and have done it on several layouts tony Link to post Share on other sites More sharing options...
toolongtoremember Posted March 1, 2022 Share Posted March 1, 2022 Here is a timelapse of what it is you are asking for, this was completed with iTrain. Link to post Share on other sites More sharing options...
Andymsa Posted March 2, 2022 Share Posted March 2, 2022 On 25/01/2022 at 15:29, vulcanbomber said: I have 6 storage loops and one of the loops No. 5 have three blocks A,B,C which can hold up to 3 trains . 1, 2 & 3. At the start all blocks are occupied, then i manually select and move the train 1 out of block A. Then I automatically want train 2 to move into block A and train 3 to move to block B, leaving block C clear. I want this to continue for ever with the trains always moving forward if the next block becomes empty. This is the only piece of automation ,I want on the layout I am just starting to use JMRI and Engine driver to control the layout. It is looking very promising at the moment I have track sensors installed in Blocks A,B,C from the time the layout was fully automated using Rocrail With the advent of Engine Driver I find it more interesting to control most the layout manually, since I no longer need to fixed in one spot in front of the control panel. I imagine I can do with JMRI but haven't any idea how to start. as mentioned by tony this can be done with TC in fact I have done this with a 6 road storage yard that holds 4 trains per road. As each train leaves the strorage yard all trains behind will move up automatically. Link to post Share on other sites More sharing options...
vulcanbomber Posted March 3, 2022 Author Share Posted March 3, 2022 Don't really want to buy yet another bit of software, hoping to do it with JMRi ot Engine Driver Link to post Share on other sites More sharing options...
Recommended Posts
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now