Jump to content
 

Seventies Summer Saturdays - BR Eastern Region


woodyfox
 Share

Recommended Posts

Hi, 

Here's the latest attempt to recreate the railways of my youth. 

A Yorkshire coastal terminus depicting summer workings on British Rail's Eastern region. 

It's N gauge dcc. 

First up a 37 arrives on ECS for a Transpennine to Liverpool. 

 

Then the Class 40 booked on the working shunts from the holding point to platform 2.

 

A prompt departure - English Electric whistling... 

 

Then over the swing-bridge and into the suburbs:

 

Cheers 

Stu 

  • Like 19
Link to post
Share on other sites

More aspects of the layout in progress:

 

IMG_20220326_100050.jpg.c477c3e55ad0b65c58b90b55648219a0.jpg

 

These are the low relief  station buildings that need some final detailing and fixing in position. This is a view from the parcel depot loading bay. The arches will continue across to the corner of the two storey building here and to the right will be the parcels point. 

A canopy/train shed will eventually cover this area. 

IMG_20220326_100038.jpg.e92bbc4df20d7326368cccbe1f84bca0.jpg

The above area shows the slope up to the parcel dock and the other end of the arches. Below these, at street level is a BR Stores area under the main station platforms. A 108 DMU can be glimpsed through the arches standing in platform 7.

IMG_20220326_100124.jpg.00c8d0b67b9ebedc9e8c3352ebd2ed26.jpg

Here's a view back across the parcel loading bay turning area. There will a a smattering of mechanical horses in this area busy delivering parcels. 

The arches are just layers of 1 and 2mm card overlaid with brick papers. 

Cheers 

Stu 

 

  • Like 15
Link to post
Share on other sites

46 minutes ago, RobinofLoxley said:

A coastal terminus with 7 platforms......in Yorkshire? Lol.

 

Scarborough had 9 in the 70s, Bridlington had around 6 or 7 and Hull (although not strictly coastal but providing direct access to coastal services and maritime routes) still has 7.

Cheers 

Stu 

  • Like 1
  • Agree 7
Link to post
Share on other sites

Today I'm starting on creating/refurbishing a Poole Farish HST set. The motor end is a 3 pole growler with poor slow running. 

This will be a 5 car blue/grey set with 2 powered cars and converted to DCC using Zimo chips. I would like to have sound at both ends too. That will be expensive but great if i can achieve it. 

Power wil be provided by the excellent Tomytec TM-07R chassis as here:

IMG_20220522_100013.jpg.57c28f172dbb4f35aee54d61c1538083.jpg

 

On the plus side, these are very shallow with lots of head space for speakers and are an easy conversion to DCC. They are also very smooth running. These were obtained from a retailer in Japan. They are cheap (under £20 each) and took just five days to arrive in the UK from ordering. 

Here's a comparison to a 101 car to demonstrate how low the weights, motor and drives sit:

IMG_20220522_100112.jpg.0eea241bcd4671675eb4966e975b04e5.jpg

 

First job is to add plastic strip to the sides to achieve a snug fit. 

Then i need to add plastic to the ends so they can be secured into the Farish bodies. The vestibule end will have a captive nut to secure all in place. 

Cheers 

Stu 

  • Like 4
  • Craftsmanship/clever 1
Link to post
Share on other sites

5 minutes ago, woodenhead said:

Interesting route to take, did you not fancy the Dapol HST?

 

The Dapol coaches look better imo.

 

Of course there is the cost, even an almost full HST costs a pretty penny.

Yes, it would've been an easier route. The Dapol sets are visually much better. The cost of a 5 car with full sound would be about 2.5x my approach. Plus - detailing and upgrading an old Poole model is more satisfying - if I'm successful..... 

 

The wheel base on the TM-07 is better than the Farish attemp to my eye. The ride height will be sorted via the captive nut placement and a retainer in the nose cones:

IMG_20220522_103805.jpg.c6ebe6d221868e13cd83b97743d719a0.jpg

 

I've glued in a 0.6mm strip to each inner side of both cars. The TM-07 in 15.75mm wide and the inner body walls measured 17.05mm. This leaves about 0.1mm of side play. 

IMG_20220522_105613.jpg.271b35aa37e71028dd67a5df2e183fb0.jpg

 

The Tomytec's come with a selection of bogie sides and end attachments for the couplings etc.. I assume these are to fit their various models. 

I messed with these plug in sections on this sprue:

IMG_20220522_105634.jpg.113c9f953500eb9f360e53b2649001ca.jpg

 

When attached to either end of the chassis it is extends to 112mm which is the length i need for fitting to the bodies. I just need to see how this affects the bogie positioning with respect to swing near the nose cone rear. 

IMG_20220522_105641.jpg.137a212a67a9a72e5f6eae19373dbf0c.jpg

Cheers 

Stu 

  • Like 6
  • Informative/Useful 1
  • Craftsmanship/clever 1
Link to post
Share on other sites

Those proper old Farish Mk3s bring back memories - you'd select whether they were loco or hst by adding/removing the buffers.

 

For some strange reason my dad never purchased the HST power cars, so we had Deltics hauling Mk3s on his railway.

 

Those coaches are so old I was a child, I over 50 now 😲

  • Funny 1
Link to post
Share on other sites

Hi, 

Today has moved me a few steps nearer to having the most successful train ever to grace a British railway run a SO service to 'the Cross'. 

IMG_20220523_161444.jpg.610a8b76f04aef0d4f8d4710b1387d07.jpg

 

This is the completed nose cone tab adaptation. This will slot into here:

IMG_20220523_161600.jpg.4c626bc80e197547a744331a4b01a940.jpg

This provides the correct ride height and leading bogie position on the power cars. 

On the rear I have drilled a hole in each of the rear vestibule doors to take a small bolt:

IMG_20220523_161521.jpg.76d2d124825c5e1fcf8f11598bf32cd1.jpg

I have also drilled 2 small pieces of nickel-silver strip that will form the brackets to attach the car bodies to the chassis's. The bolts will be invisible once vestibule connectors are added to the adjacent coaches in what will be a fixed rake. 

IMG_20220523_164402.jpg.596b13061f0aff3d224f02a034211358.jpg

Strips drilled out and formed to an L shape. 

 

IMG_20220523_170317.jpg.7b35dc29f54012f833f5eeb878899c4f.jpg

And here with captive nuts soldered on and tested with the bolts screwed in. They are nice and free moving when tightened and loosened. 

Next stage will be attaching these at the right height on the chassis ends. 

Cheers 

Stu 

  • Like 4
Link to post
Share on other sites

The HST cars are now at the stage where bogies and below sole-bar details can be added to the chassis. 

Here's the n/s tabs in place to secure the bodies with a single brass bolt and tab:

IMG_20220524_162811.jpg.be394cbe6800262a332d46626141d562.jpg

 

And the power cars secured on the chassis:

IMG_20220524_162703.jpg.dafcd50b79af5d6d995604f63d0b3140.jpg

 

I have several things on the go with this project at various stages of completion. It enables me to flit from one to another avoiding the tedium of repetitive tasks that generate boredom. 

One such is the construction of a 100+ room low relief hotel next to platform 2. There are a lot of windows to make up and lots of masonry details to add. This will have an upper pitched roof in the central section with windows too. The ground floor will sit below the gutter level of the station trainshed roof. 

IMG_20220524_163001.jpg.afd9350126f5fd93fdc0dce5318c7b12.jpg

IMG_20220524_162949.jpg.cd85e9492e32064532d28322ac08be6c.jpg

 

Cheers 

Stu 

  • Like 11
Link to post
Share on other sites

The HST cars now have bogies attached to the chassis. These need to be run in before DCC conversion. There are two synchronised sounds chips on order from DC Kits loaded with Paxman engine noise. 

Meanwhile, playing trains continues:

Here a mid-morning inbound 108 DMU working crosses the river. The clickety-clack brings back memories of old 'tin cans' rattling along:

 

Followed a few minutes later by an EE type 3 bringing in ECS for a lunchtime KX service:

 

This will return with a Deltic... 

Cheers 

Stu 

  • Like 5
Link to post
Share on other sites

  • 4 weeks later...

Hi, 

Latest little project is nearly finished. The below is a representation of the old BRSA club in Hull - now known as the Tiger's Lair. 

IMG_20220624_141611.thumb.jpg.4a25ff5402e280d6738c11f8fbf4edaa.jpg

 

This was drawn out to scale using Google maps and brick counting to get an approximate measure. The chimneys are not present on the current building and i did a bit of back dating. 

IMG_20220624_141555.thumb.jpg.6c764e8496051a8150f5928d776a44c6.jpg

 

I used scrap 1mm thick card and cereal packet card overlaid with Scalescenes' papers. The windows are 160gsm paper with clear plastic packaging backing. 

IMG_20220624_141804.thumb.jpg.fd7ad219a69eef5f8c6f1e4136f809a6.jpg

Here's a ruler for scaling. 

The whole thing was drawn in Design Space - a CAD software program free with Cricut machines. The walls, roof and windows were then cut out by the Cricut (Maker 3 model). The window frames are down to 0.8mm width. I'm not sure i could get a much thinner cut on the 160gsm paper. 

I may try scoring clear plastic next time and the use the brush on/wipe off paint method to get really thin frames. 

The Cricut is a remarkable and versatile machine and the design software is very easy to use. 

I have plenty of buildings to create and this is a great investment. 

Just need to weather down the building and add a bit of signage. I think it will be a BRSA club again... 

Cheers 

Stu 

  • Like 10
Link to post
Share on other sites

54 minutes ago, eastwestdivide said:

Like the swing bridge - Goole or Selby? And does it swing, or is that a bridge too far?

Thanks. It's Selby and it doesn't swing - that would require ingenuity beyond this project... 

  • Round of applause 1
Link to post
Share on other sites

  • 1 month later...

Another venture has begun to enjoy some holiday train running (eventually. 

I'm recreating Malton as it was from about 1966 to 1980. Two mill scale again with code 55 N gauge p.way.

 

I'm busy with the station building section at the mo on a 1220x450mm board. I've attempted to recreate the gentle curvature through the station.  All is wired up for DCC with the turnout operated using a Cobalt motor. 

IMG_20220821_103927.jpg.6dead4543a2f92b1eb13fc7fba307ee8.jpg

Looking west. The DMU car is sat in what will be the centre of the GT Andrews trainshed roof. 

IMG_20220821_104010.jpg.0f2c9fb43c1c46345bd41db3528af36e.jpg

I've added the slight cant to the down line curve at the west end of the platform using a card shim. This view of the side of the Station Master's house is no longer possible. 

IMG_20220821_104100.jpg.6a032569a069a634f268303c9a6963fe.jpg

This is the front of the house and is the last building from east to west of the various ones that made up the station complex. The model is designed to be viewed from 360 degrees. 

 

IMG_20220821_104137.jpg.07527b99ef46d88960feb3aaba61518f.jpg

This is the bay area that's a small supermarket now. The interior wall held up the canopies and was whitewashed in images i have. Track was lifted in '66 from what i can tell. 

 

IMG_20220821_103838.jpg.93936f901ac3dc04ee369fabed88b77f.jpg

This is the waiting room towards the west end of the platform. Cruel close-up to show the detail of the windows. I scribed polycarbonate sheet and filled the grooves with with acrylic paint. 

Lots of weathering to do in stages as the various layers of construction take place. 

 

Cheers 

Stu 

 

  • Like 9
Link to post
Share on other sites

Today's efforts have concentrated on the station exit, news stand and cafe area plus roof base and chimneys for the SM's house. 

IMG_20220822_172248.jpg.b1df5a3bf078f8c7db9329c575047098.jpg

 

The colour scheme for the news stand is a 'guesstimate' based on grainy b/w images.  Guttering drops and cable runs will be added before the sections are glued in. 

IMG_20220822_172216.jpg.bf57909828b1bbb6c87031f72e627379.jpg

 

The exit opening is based on the current refurbished version which I think is almost certainly very,  very similar to the 70s version. 

The frames are made from a white sticky label sliced to size and backed appropriately with clear plastic sheet. 

Again,  this section will be within the cover of the overall trainshed area. 

Cheers 

Stu 

  • Like 7
Link to post
Share on other sites

Lots of progress on the station approach view of the station buildings. About half are complete bar slate tiling, detailing and chimney stacks. 

I've detailed the ticket office a bit as this will be almost viewable through the open entrance. The phone box has also had some basic details added. 

IMG_20220829_114524.jpg.a1b8fe17fdef4e164782de091068872c.jpg

IMG_20220829_114513.jpg.67e508a04615d7524badcb345773b86a.jpg

IMG_20220829_114453.jpg.fcdb0a4040e8d590422aa47e9a7f8fc3.jpgIMG_20220829_114441.jpg.1b72de22545b53ff77db711ebd0cef42.jpg

IMG_20220829_114432.jpg.26b31824a9ae379d31eaf605fa78a4a0.jpgIMG_20220829_114419.jpg.dda46f8ca2f1153cc5e038ad88a4fdf8.jpg

 

The best images i have of this section date from 1965 +1978. I've gone with the 78 images for paint schemes etcetera. 

 

Cheers 

Stu 

  • Like 6
Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
 Share

×
×
  • Create New...