Part 13. Second fix scenery and a concrete viaduct ....

 

(Funny how there's been little comment on the thread until there's mention of a bird on Page 3 :lol: )

 

Anywho, back to the story... Well the cork trackbed got laid by John and Damian faced up the boards with ply to match the contours of the land. Track laying began on the station board. The photo below shows Damian's ply facing fixed to the viaduct board.

post-6675-0-74197500-1297192537_thumb.jpg

 

Towards the end of May two of the boards arrived back at my house for a 'second fix' of scenery. The photos blow show this starting to take place and a foamboard mock up of the viaduct in place.

post-6675-0-31802700-1297190219_thumb.jpg

post-6675-0-78671700-1297190223_thumb.jpg

 

Around this time,having referred to the David Wroe books of the area, we found that Treneglos embankment was originally planned to be a viaduct. This idea was scrapped due to the ground conditions being too poor to support the masonry piers. In actually fact poor ground here continued to blight the real railway, photos of the embankment show level markers set in the track to record slips.

 

We found that the Bude branch, built around the same period, had a couple of viaducts and that they were actually built from precast concrete blocks owing to the shortage of decent building stone. So we tinkered with history and used a reduced version of the Bude branch viaduct design as the basis of our viaduct.

  • Like 4
Link to post
Share on other sites

  • 2 weeks later...
  • RMweb Premium

Oh no, we made a boo boo.

 

Interesting discussion about Treneglos and the 'serious gaffe' of non-accurate catch / trap points installed on the down loop here.

 

For the record can I say that had we set out from the very first day to model a station on the NCR then we would have made sure that such things as the location of ground discs and the presence of catch / trap points was correct. However....the preceding posts in this thread should show that when the layout was born we originally had no intention of modelling a typical NCR station 100% accurately or otherwise. That idea crept in 'organically' as time progressed and we learnt more and more about the Southern's Withered Arm.

 

At the time the track plan was devised we had very limited access to prototype books on the line (for instance the original David Wroe volume was out of print and very hard to find) and resources on the net were much more limited than today - 8 years later. To be honest, I'd have loved to have had then the information we now have about the line. That way other 'gaffes' such as the station building being too short would have been avoided.

 

We first found out about the layout incorrectly having catch / trap points on the main passing loop at the Wadebridge exhibition in November 2005 - nearly 2 years after the layout was built. This information and lots of other interesting details came from a fireman who regularly worked the NCR route.

 

Obviously we were disappointed to find out about this inaccuracy. It is worth pointing out though that in 8 years of operation, nearly 30 shows and various articles printed in the modelling press pointed only one person and a specialist signalling website have ever taken the time to point out this error (and only the ex-fireman contacted us directly). I do wonder how many thousand people have enjoyed watching the layout completely oblivious to the 'serious gaffe'.

 

Most of the comments we get relate to how well the layout captures the 'character' of the line. In truth I'm happier getting that sort of comment than say producing something 100% accurate but with no character. The latter is easily done in the quest for absolute fidelity.

 

So in hindsight, yes we'd have done things differently second time round, knowing what we know now. Also in hindsight, and now knowing how useful the RMweb community can be, were we to build the layout from scratch again we'd make full use of the 'web knowledge' present on this site to get the details of a new 'Treneglos' right.

 

With regard to correcting the mistake.... well, the layout is now a fair way through it's life - and that we have two other projects demanding time, effort and exhibition invites - the likelihood of ripping up track and ballast is probably zero. If anyone does point out the error at future shows then yes we can hold our hand up and say 'yes we know'.

 

It's not that we're not bothered by accuracy. The original coal yard was deleted two years ago because we found out that they didn't exist on the NCR. It's more a case of available time to fix (and disturbance to the layout) vs the degree to which the viewing public may be aware of the problem. Pragmatism.

 

So there we have it, my response to 'trial by specialist website'.

  • Like 2
Link to post
Share on other sites

  • RMweb Premium

Part 14. John does another note ....

 

Ok, back to the plot. On the 6th April 2003 John took stock of where we were at with the layout in his usual 'post-Horns' style and minuted up actions from our end of March session and a cunning master-plan for the various boards to travel round various parts of the East and West Midlands to have work done on them.

post-6675-0-84873400-1297981234_thumb.jpg

 

Looking back at these comments nearly 8 years later it is interesting now to note:

1. The possibility of a 4th scenic board after the viaduct board raised its head - this we did (but more of that later)

2. We never used tungsten-type mini spotlights but went for eco-friendly (as long as you don't break one) low energy lamps

3. The lighting fascia didn't get supported by 'slim steel rods' at the front of the layout (as favoured by John) but instead by some substantial steel section trusses from the rear

4. Lots of activities going on in various houses spread geographically around in the Midlands. In fact the layout seldom was seen all together during the construction year. I do wish we'd recorded the mileage clocked up moving boards around and the various car parks that dodgy board-swapping deals were done!

  • Like 3
Link to post
Share on other sites

  • RMweb Premium

It's good to see the massive developments that you made in the creation of the rivers and their banks.

 

Thanks Kris

 

It's only really when you do a sequence of shots like that that you realise how much work went into creating the scene - from baseboards, track and arty stuff! It's good to reflect sometimes and realise what was achieved in such a short timespan.

  • Like 1
Link to post
Share on other sites

  • RMweb Premium

Part 15. John goes wandering in the SW ....

 

Strangely my records are a bit quiet with regards to what we did between May and August but I'm sure we did quite a lot. One thing is for certain though, In mid August John decided to take his long suffering better half on a nice trip down to Devon and Cornwall. Little did she know but this was a cunning excuse for a field trip.

 

John being an 'artist', drew up details of the bridges he saw. This is what Damian and I received in the post....

post-6675-0-59166800-1297982936_thumb.jpg

post-6675-0-85344100-1297982941_thumb.jpg

post-6675-0-15495600-1297982931_thumb.jpg

 

Hopefully the sketches and notes may be of use to someone else.

  • Like 5
  • Round of applause 1
Link to post
Share on other sites

  • RMweb Gold

An impressive catalogue of professional site and artefact analysis here - no wonder Treneglos "looks" right!

 

Whenever an RMWebber asks how to find out more about his/her chosen prototype, this would show them one way!

 

Hopefully you also found a few of those delightful Cornish hostelries en route!

  • Like 2
Link to post
Share on other sites

  • RMweb Gold

An impressive catalogue of professional site and artefact analysis here - no wonder Treneglos "looks" right!

 

Whenever an RMWebber asks how to find out more about his/her chosen prototype, this would show them one way!

 

Hopefully you also found a few of those delightful Cornish hostelries en route!

Well said Ian.

 

And thank you Chris(and the rest of the Treneglos team) for putting all this up for public viewing. It has certainly given me a bit more inspiration to crack on with my own small scale efforts.

 

As someone who is planning a fictitious junction on a factual railway (albeit it now closed,)I have no excuse for not carrying out a detailed recce of the chosen area (M4 embankment permitting :lol:) especially as it is not too far from my parents home.

 

Regards

 

Richard

  • Like 2
Link to post
Share on other sites

  • RMweb Premium

Thanks Ian / Richard

 

The research side is something I've really got into since starting Treneglos all those years ago. it's great finding information out and visiting the actual site of the prototype or the area you intend setting your fictional layout in. It's a great excuse for popping into pubs (they often have photos on the wall) or talking to the locals. Sadly you don't get the same 'feel' for an area off google earth or photos. This is the problem with our current project as there's 6000miles of water in the way!

 

I was discussing with John the other night the order we built the cutting board in - track before or after the rock face - we'd convinced ourselves it was the former but then a photo proved otherwise. Learn from us, take plenty of photos/notes while you're building as you'll forget what you did in no time.

 

There's lots more to come....

  • Like 1
  • Agree 1
Link to post
Share on other sites

  • RMweb Premium

Part 16. I've lost the plot ....

 

To be honest I'm not quiet sure what happened next but at some point we decided that the layout ended after the viaduct too abruptly and trains should have something to disappear through. Anyway Damian built another board and we extended the layout by 4' to 24' of which 16' would be scenic. In retrospect this was a bit of a brash thing to do as we had committed to attending Stafford's 2004 show but hadn't yet finished the current boards.

 

After John's site visit and looking at the real OS map of the area we noted there should really be a cutting to the west of the viaduct (embankment in real life). So that was that and very quickly I plopped some polystyrene onto the new board to make up the profile of a cutting. The photos show the work done on this section in August 2003.

 

The first photos show the polystyrene in place and covered in a layer of plaster. To the right hand side that really is crumpled kitchen foil. Note spare bits of 'rock' on top of the LHS bank.

post-6675-0-74146900-1298323073_thumb.jpgpost-6675-0-53036100-1298323082_thumb.jpg

 

It's a double thickness of foil screwed up and then teased out until flatish but still crinkly. This was offered up to the cutting and formed into the rough shape needed. Next sloppy plaster (with grey colouring in) was poured in to the horizontal foil 'mould' and left to set. The set plaster (still attached to the foil was attached to the cutting side with PVA glue and left to dry. Then the foil was carefully removed from the rock face.

post-6675-0-90603100-1298323088_thumb.jpg

 

This is a close up of the raw effect. Lots of air holes and missing bits to sort out. These were filled using left over bits form the original mould that had been cut off from elsewhere and small bits of filler.

post-6675-0-33407700-1298323095_thumb.jpg

 

The effect looking down the cutting from the driver's eye.

post-6675-0-71722200-1298323101_thumb.jpg

 

Once all in place thoughts turned to the overbridge. As per the original, the road was on a gradient and in the photo below a steel bar has been placed in the approximate position of the bridge. The van gives a bit of scale.

post-6675-0-75746000-1298323067_thumb.jpg

  • Like 3
Link to post
Share on other sites

  • RMweb Premium

Part 17. It all comes together ....

 

Hopefully it will be gathered by now that the layout so far had been built in various peoples houses, sheds and garages. It had had a nomadic life and so far all the boards had spent very little time together.

 

By September 2003 we decided it would probably be a good idea if the layout was gathered together in one location. This would help us with things like getting a good line on the track curves over board joints and generally seeing where we were up to.

 

So far we had kept the layout's construction secret from all but a few at the club but got agreement that we could secretly set it up in the clubrooms a day one weekend. So, like the big arrows at the start of Dad's Army titles, we all converged on the club one Saturday bringing with us all the various bits we'd each been working on.

 

The photos below show what it looked like on the day. (Sorry about the photo quality - the light was very poor)

 

First off - the Padstow end of the layout showing that I'd bedded in the rock face and had started to make the bridge. At some stage prior to this session this board and the viaduct must have gone back to John or Damian's for track laying and ballasting. I would expect that Damian has added all the electrical droppers (one of the many jobs he did that you can't see on the finished layout). John has obviously given the rock face a first coat of paint.

post-6675-0-49963000-1298324847_thumb.jpg

 

Moving on to the viaduct board. It looks like the original idea was to have the road crossing the stream on a bridge. This got amended to a ford crossing before the first show.

post-6675-0-20102200-1298324851_thumb.jpg

 

Looking now down towards the Okehampton end of the layout we see the viaduct from the opposite angle.

post-6675-0-12948100-1298324855_thumb.jpg

 

The next shot shows the station throat with sleepers laid. Obviously some serious thinking going on in the background.

post-6675-0-47810800-1298324858_thumb.jpg

 

And now, for the first time in photographs, the developments on the station board. The station building and road bridge are still card mock ups, but work has begun on the waiting shelter. There's a small section of platform facing in place on the up platform too. The Pway gang have been busy laying track and a Bulleid coach is being used to test for platform clearances. Still lots to do.

post-6675-0-10423500-1298324862_thumb.jpg

post-6675-0-07392200-1298326051_thumb.jpg

 

Turning back to the station throat there's obviously something funny going on - I would expect at John's expense!

post-6675-0-20388700-1298324844_thumb.jpg

 

I don't recall how much we actually got sorted on the day but we did have time for a few posed shots. The second shows the rock face primer in more detail.

post-6675-0-50742500-1298324868_thumb.jpg

post-6675-0-27249900-1298324871_thumb.jpg

 

Only 5 months left to the first show.....

  • Like 4
Link to post
Share on other sites

  • 3 weeks later...
  • RMweb Premium

Mmmm, trouble at 't mill.....

 

Just tried to get on to our Fotopic website and it would appear that either the Fotopic name owners have gone bump or that the server has had a major hissy fit. Either way there's loads of folk out there that don't seem to have access to their photos. I'm glad I started transferring info on to this thread, just a pity I didn't complete the job. Just goes to show that nothing lasts forever in this digital age.

  • Like 1
Link to post
Share on other sites

  • RMweb Premium

long time no post.... In preparation for the Melksham show in April (9th 10th) I went over to Damians house and we had a good session sorting out and attacking a load of jobs that needed going. I spent most of the day soldering and sawing. (No burnt fingers) Damian did chopping, sanding and painting. Oh. And he invented a great new way to combine house and layout painting in one hit!

Link to post
Share on other sites

  • 2 weeks later...
  • RMweb Premium

Not many words as the home PC is away being fixed and the phone has a very small keyboard...... In just over a week we'll be taking Treneglos down to the Melksham show which, I beleive, is bordering on SWAG country! Those who have seen us before will hopefully note that Damian has been working hard in the Newark layout production facility to spruce it up a bit. Please say hello if you see us at the show.

Link to post
Share on other sites

Not many words as the home PC is away being fixed and the phone has a very small keyboard...... In just over a week we'll be taking Treneglos down to the Melksham show which, I beleive, is bordering on SWAG country! Those who have seen us before will hopefully note that Damian has been working hard in the Newark layout production facility to spruce it up a bit. Please say hello if you see us at the show.

It's not bordering on SWAG country. It is very much in SWAG country.

 

Geoff Endacott

Link to post
Share on other sites

Not many words as the home PC is away being fixed and the phone has a very small keyboard...... In just over a week we'll be taking Treneglos down to the Melksham show which, I beleive, is bordering on SWAG country! Those who have seen us before will hopefully note that Damian has been working hard in the Newark layout production facility to spruce it up a bit. Please say hello if you see us at the show.

 

 

She's ready and waiting.........

post-8734-0-36518800-1301738066_thumb.jpg

  • Like 3
Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
 Share

×
×
  • Create New...