Jump to content
 

Blog- Steam_Julie's Layout Blog - Trefeglwvs Road Cambrian Railways 22


RSS Fetcher

Recommended Posts

Hi

 

Since the last blog post I have made a cover to protect the scenic section, both in transit and when work is being carried out on the electrics etc. on the underside of the layout.

 

I have also installed a over-centre catch to keep the two half’s in position when the layout is being carried and being packed ready for transport.

 

I have also built some stubby feet, this is to allow the layout, in operation mode to be placed on a table, say the kitchen table, which allows the layout to be worked on, without needing the full legs to be installed. These legs have felt pads on the legs to prevent damage to the table top.

 

The ability to fold the layout also has made storage, at home, much easier as it can now fit onto the available shelves.

 

I will really be progressing the scenery soon!

 

Julie

 

View the full article

Link to post
Share on other sites

Archived

This topic is now archived and is closed to further replies.

×
×
  • Create New...