Jump to content
 

Blog- Petes Model workshop (or ramblings from the balcony) - GWR MOGUL (8)


Recommended Posts

Just a little done. First off is there is a cover between the splashers on the right hand side, this needed making as it is not in the kit. The vacuum pump cover goes out board of this.

 

 

Next I add the safety valve cover as the it is cast brass, I did not want to lose everything later. The pipe work for the top feed is not in the kit either. So this was fabricated from copper wire and some half round brass. Still needs a bit of tidying but looks passable to me.

 

 

 

Hopefully I can progress some more over the next few days.

Attached thumbnail(s)
  • blogentry-13601-0-61162400-1403274701_th
  • blogentry-13601-0-82133700-1403274704_th
  • blogentry-13601-0-32489100-1403274708_th

 

View the full article

Link to post
Share on other sites

Archived

This topic is now archived and is closed to further replies.

×
×
  • Create New...