RSS Fetcher Posted June 20, 2014 Share Posted June 20, 2014 Just a little done. First off is there is a cover between the splashers on the right hand side, this needed making as it is not in the kit. The vacuum pump cover goes out board of this. Next I add the safety valve cover as the it is cast brass, I did not want to lose everything later. The pipe work for the top feed is not in the kit either. So this was fabricated from copper wire and some half round brass. Still needs a bit of tidying but looks passable to me. Hopefully I can progress some more over the next few days. Attached thumbnail(s) View the full article Link to post Share on other sites More sharing options...