After a couple of weeks I've now completed the cross-over and catch point on the fourth baseboard. Following prompting from 'Western Star' I redrew the cross-over using a pair of C8 turnouts which meant I could use the pre-prepared Vs I'd bought from C&L earlier in the year. I'm quite pleased with the results. I also managed to get the baseboard pretty much wired up.

 

Wiring up is quite straight-forward with DCC and the MERG control system CBUS.

 

I drilled loads of holes and threaded through loads of short 'dropper wires', Red for the rear rail, Black for the front rail and then a different colour for each V which needs to be switched.

 

Attached Image

 

The MERG CBUS controls an 8 output accessory controller which drives a pair of 4 relay boards. On those relays one output drives the input of a four Servo control board while the other output switches the V. This method means that once the circuit boards have been installed the actual wiring to the track is really easy. The rest of the control, the what level makes what point move, is all done in software.

 

So, here is a picture of my Heljan Class 15 shunting the coal siding.

 

Attached Image

 

The driver's view from the locomotive shows the end of the loop and the line to Long Melford you can see the route into the Cambridge bound platform.

 

Attached Image

 

Looking back the other way (the camera is looking from the lay-by track)

 

Attached Image

 

I'm now progressing on the cutting drawing for the fifth board and hope to get that cut during the week.

 

I hope you enjoy seeing the progress.

 

David

  • Like x 10
  • Craftsmanship/Clever x 2





Photo
Western Star
Nov 05 2018 09:47

Good clean work with a nice flow through the S&C stuff.

Hi David.

Yes, I very much enjoy seeing the progress with your layout. As Western Star says, the trackwork looks very neat and flowing and you seem to be making good progress.

In the bottom photo, is the left hand point just a trap at the end of the lay-by or does it extend further towards the yawning gap?

Keep up the good work.

Dave.

Nice flowing trackwork there.

Photo
Fen End Pit
Nov 05 2018 20:06

Hi David.
Yes, I very much enjoy seeing the progress with your layout. As Western Star says, the trackwork looks very neat and flowing and you seem to be making good progress.
In the bottom photo, is the left hand point just a trap at the end of the lay-by or does it extend further towards the yawning gap?
Keep up the good work.
Dave.

To quote Admiral Ackbar "it's a trap"
David

user(s) viewing

members, guests, anonymous users

Tags

    Search My Blog

    MyBlogLog

    My Friends' Blogs

    Latest Visitors

    • Photo
      Cliff Williams
      Yesterday, 14:42
    • Photo
      Valentin
      Yesterday, 12:30
    • Photo
      RoyalClaud
      Yesterday, 01:40
    • Photo
      rogirbu
      18 Jan 2019 - 16:26
    • Photo
      Joe61264
      17 Jan 2019 - 22:58
    • Photo
      Colne Valley Kid
      17 Jan 2019 - 21:21
    • Photo
      Pannier Tank
      17 Jan 2019 - 17:31
    • Photo
      gazzaday
      16 Jan 2019 - 17:55
    • Photo
      boogaloo
      16 Jan 2019 - 12:45
    • Photo
      ikcdab
      15 Jan 2019 - 17:23