More progress on the goods shed. It seems to be taking ages but with approximately 7,500 bricks to stick on for this part I guess it will be slow. I will be making the second basic shell now I have more card. I will post again soon
For stubby to show how big the gaps look if you try to make a mortar course. The gap left is 0.5mm and it looks huge that's why I put them touching and let the natural radius define the mortar. Also most mortar courses are 12mm between real bricks and I don't fancy trying to represent a half inch at 4mm scale!!
My buildings for a proposed shunting layout based on Richmond in Yorkshire.progress will be slow cos I use computer chads for individual bricks. I must be mad the goods sheds are 2' long so its a labour of love. I have a coal office nearly done it still needs guttering,notices and weathering
Brick laying has started on the goods shed. There will be a warehouse attached to the end at a slight angle, making the complete building approximately 2' long. All to be brickwork. Will post more on pro