ECC TDA Slurry Tank Conversion
Back in 2009 I started work on building a TDA slurry tank, while these were not actually used in Cornwall (instead dedicated to Quidhampton), the other Quidhampton slurry tanks did appear in Cornwall (and I rather liked the prototype.)
The initial stages of the build are covered here, http://www.rmweb.co.uk/forum/viewtopic.php?f=8&t=74&start=575 on the old forum.
This is what the prototype should look like
https://www.flickr.com/photos/hmillington/2044676492/sizes/o/in/set-72157603195747980/
Picking up where I left off the first job was to add the angled sections at the ends, with the sides added from 40thou cut to shape and then a top from 20thou. (Having superglued the bogie retaining bolts into place.
It now needs the end handrails adding, buffers and a roof walkway. I also need to work out where I put the bogies when I last worked on it back in 2009...
0 Comments
Recommended Comments
There are no comments to display.
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now