Jump to content
 
  • entries
    20
  • comments
    17
  • views
    12,876

About this blog

General movements on Platform 1...

Entries in this blog

Activity resumes - track!

So there's the summer been and gone... wasn't it a good one (in the West Country anyway)?   Now the evenings are drawing in, thoughts have returned to the loft layout.  Track has been acquired, and some progress made in laying it.  Each board has to be laid and wired separately in case it has to be removed some time in future.  The dropped board is easily (!) removable to access an under-eaves cupboard.   The fiddle yard area is a bit of a squeeze to get to (see photos) so hu

Platform 1

Platform 1 in Track

00 Track Comparison

It's been a while! Amazed how long it takes to turn a new room into a usable space - painting, flooring, shelves, heating, workbench, lighting - together with the usual demands of family life...   So here we are with a bit of new activity before the layout proper gets under way. The shots below show three types of 00 track: Peco streamline code 75 flat bottom, the new Peco code 75 bullhead, and C&L flexi track.   The ballast looks over scale to me. Which do you think look

Platform 1

Platform 1 in Track

×
×
  • Create New...