Lower Ebb Railway Project
1991 In the beginning...
Loft 2/3 boarded out, I add power and light whilst rewiring the house, a man-size 4’ x 2’ hatch and fold out timber ladder is installed.
Work on OO gauge railway in loft begins, scale track plan of Midsomer Norton for S & D layout created manually on a photocopier from OS mapping, boards ¾ built and storage sidings side laid in Peco Code 100 flexible N/S track.
The Interregnum
No progress after illness stops work. Doubts ove