Jump to content
 
  • entries
    12
  • comments
    11
  • views
    4,798

About this blog

OMWB and Speedlow layout

Entries in this blog

Issue 6 Speedlow

Hello again, in this issue I will continue describing how the Speedlow layout came about and how I wanted to build and operate the layout.   Right from the start it was always envisaged that Speedlow would be DCC operated and I tried to plan for that accordingly when it came to planning the track plan. The layout boards as previously described in Issue 5 were built for me by Black Cat Baseboards in 2011 to the design I specified. There are 4 boards each 4 foot long and two additional o

pharrc20

pharrc20 in OMWB

×
×
  • Create New...