Jump to content
 
  • entries
    3
  • comments
    0
  • views
    1,093

About this blog

A layout that is based in the late 60s and as such will require extensive weathering and lots of tinkering

Entries in this blog

modeling on a shoe string budget.

Leaving the station "67" 17/11/2014   Today I embarked to create point levers although there is no layout built at this time it is A money saving and B time well spent that will not be needed to be done later on.I have also been racking my brains over what type of lighting to add to the layout after much fiddling i am going with a telegraph pole type light allowing the power to be transferred via the telegraph cables this it my next project.I understand that both of these items are on sale an

jonathan3005

jonathan3005

Leaving the station "67" :Changing plans,thanking friends

Leaving the station "67"   13/11/2014     After reviewing the plans for the layout many thing have changed and due to friends they have changed for the better.   CHANGES   Track The first change relates to the track work I was told by a friend that the catch point was well thought out however due to safety for BR paying costumers the crossover leading onto the double slip is being replaced by a single slip meaning wrong line running is prevented and correct operation is paramount this

jonathan3005

jonathan3005

Introduction to Leaving the station "67"

Leaving the station "67"     12/11/2014     With that time of the year approaching and the festive season on its way it is hard to ignore the fact that new year is drawing near and if you are like me still no plans so when this time arrives a layout emerges having 240x60cm to play with and a laptop at my side i was quickly engaged and the brakes soon let go of the rails and my mind was off,the reason for it being called leaving the station is due to my love of the bath green park terminus

jonathan3005

jonathan3005

×
×
  • Create New...