Jump to content
 
  • entries
    31
  • comments
    49
  • views
    5,225

About this blog

This blog about a fictitious BR(WR) Engine shed in Cornwall based on what might have been if the proposed lines to St. Just and Lands End were built.

Entries in this blog

Clamping and Gluing

The clamps I’d ordered to help with construction of the baseboards arrived yesterday, which enabled me to start constructing the framework for the first board. In an attempt to keep these large baseboards as light as possible I’m only gluing the components together, no screws or pins. On my previous layout (Tredethy Wharf) I’d glued and screwed the boards together so this is new territory for me. On these boards with the amount of joints and the supposed strength of wood glue (around 3000ppsi) I

Yan

Yan in Buildings


×
×
  • Create New...