Jump to content
 
  • entries
    30
  • comments
    42
  • views
    16,970

Slaters Johnson 1P Construction Complete


ROSSPOP

704 views

Construction of this enjoyable kit is now done.

 

A lot of the detailing is not attached yet as I intend to paint them all first.

 

The kit provides both brass etch and plastic strip boiler bands which obviously fit in the milled grooved boiler, I hav`nt decided which to use yet.

 

Time to go for a longish lay down before I start the priming and painting journey.

 

Thanks for all the likes, etc, etc.

 

blogentry-17779-0-48759000-1464542956_thumb.jpg

 

 

 

blogentry-17779-0-65441300-1464542974_thumb.jpg

 

 

 

blogentry-17779-0-95708500-1464542989_thumb.jpg

  • Like 3

3 Comments


Recommended Comments

  • RMweb Gold

What a beautiful build. Enjoy the rest, much deserved! 

Link to comment

That looks very nice indeed.  You have earned that "longish lay down".

 

My experience with brass boiler bands is far more positive than I had expected at the outset.  One thought would be to use a lower melt solder paste if you go the brass route.  That brass boiler does look as though it would need a lot of heat to sweat the brass bands onto it.  Which may be why Slaters provide plastic bands as an alternative?

Link to comment
  • RMweb Gold

Thanks again folks.........

 

I need a break from soldering so I`m opting for the plastic ones fixed with Gorilla superglue !!

 

 

Cheers .....

 

PS.  I`m still lying down .......

Link to comment

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
×
×
  • Create New...