Jump to content
 

The trackwork (2)


6990WitherslackHall

236 views

04/08/23

 

The layout is now fully wired up however this point next to the TMD is a bit troublesome.

 

IMG_20230804_210827_783.jpg.32b6a9dbe52d848b0acde95994551b8d.jpg

 

The loco I was using, 73212, would go on it and as soon as the they got on it, it would stall. It worked fine when it was set straight but it wouldn't when it was set in the other direction.

 

However, upon closer inspection, I found out that the point blade wasn't touching the side of the rail properly so I carefully bent the end of it a bit to see if that would work. Needless to say, it did and the 73 now traverses over it fine. 

 

The point blade after I slightly tweaked it.

IMG_20230804_210836_594.jpg.35c0565ab227bd09d14d2a699983b633.jpg

 

After that little setback, I tested the rest of the track with the 73. Everything was in working order. 

 

73212 on track testing duties. 

IMG_20230804_212228_881.jpg.05d582f8369cdeeefe354ff0357a09ef.jpg

 

29/12/23

 

A LOT of work has been happening since I last posted. I've completely rearranged the entire track plan and have discarded of (but haven't binned) the PECO manyways engine shed. I've lengthened the fiddle yard by ripping up some of the scenic section. Now it can accommodate a 3 coach train plus loco.

 

The lengthened fiddleyard

IMG_20231228_214310_792.jpg.6f292271ca6ab1e2085233e9ccddacac.jpg

 

The new trackplan. Note 37421 in one of the new sidings. I was using it for track testing duties.

IMG_20231228_214253_189.jpg.525e627629669b29986bdb14ba32c632.jpg

Edited by 6990WitherslackHall

  • Like 1

0 Comments


Recommended Comments

There are no comments to display.

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
×
×
  • Create New...