Jump to content
 
  • entries
    4
  • comments
    4
  • views
    827

About this blog

Draxbridge is my current N gauge layout which I've had since 2018. However, I think it could do with an upgrade. This blog will cover the overhaul of the layout.

 

Entries in this blog

The trackwork (2)

04/08/23   The layout is now fully wired up however this point next to the TMD is a bit troublesome.     The loco I was using, 73212, would go on it and as soon as the they got on it, it would stall. It worked fine when it was set straight but it wouldn't when it was set in the other direction.   However, upon closer inspection, I found out that the point blade wasn't touching the side of the rail properly so I carefully bent the end of it a bit to see if

The trackwork

On the scenic section, Draxbridge had two sidings, one of which also acts as a headshunt, a crossover and a point that leads into the TMD shed. However, I think it could do with an upgrade as I'm not particularly happy with the current track layout.      So I set about thinking on how I could improve the layout. One of my ideas was I could add a pair of points on the two sidings. I had three points already but I could always buy some more if I needed any. So I set about comin
×
×
  • Create New...