Jump to content
 
  • entries
    8
  • comments
    51
  • views
    6,995

There's life!


Brinkly

549 views

Horrabridge - BR Western Region circa 1956

 

I’m sure that everyone is fed up with me going on about it for the past two years, but I have decided to grab the bull by the horns and go for it.

 

Right over the past three weeks I’ve made some big decisions about my modelling. First of all I am going to build Horrabridge, secondly it will be built in P4, I had been toying with doing it in EM or even Finescale 00, but decided to continue to keep plodding with P4 rather than swopping gauge again. Brian Pearce has been an excellent help and his wealth of experience has been of such use.

 

Below is an introduction about the history of the line and my proposed modelling plan.

 

History

 

Horrabridge station is a small country station on the 31 mile branch running from Plymouth through the West Devon countryside to Tavistock then crossing into Cornwall and entering the large county town of Launceston.

The station opened for passengers in June 1859 and February 1860 for goods. Closure came on 31st December 1962, with the track being lifted in 1964.

 

The station had a large goods yard, as wagons were stored here for the Princetown branch as Yelverton (the junction station for the Princetown branch) didn’t have any goods facilities. Another interesting feature of the station were the two water columns which were installed for Princetown locomotives which would run to Horrabridge to water before returning to Yelverton with any freight wagons.

 

Below is an old OS map from 1906 showing the station layout, on the ‘up’ side the main station building, Saxby and Farmer Signal box, goods shed and further along the ‘up’ head shunt was a privately owned granary, built of local stone. On the ‘down’ side (Up being towards Plymouth, Down to Launceston) a small waiting shelter and the siding for the Princetown branch, a water tower and permanent way buildings.

 

blogentry-7376-057505800 1286915964_thumb.jpg

This is a map dating from 1906 so is no longer under copyright protection. (Plymouth Library 2009)

Model

 

 

Originally Horrabridge was not going to be a exhibition layout, but gentle persuasion from a number of members on several forums and members of my local Scalefour club (Devon Riviera Area Group) has changed my mind, although this layout is primarily for home use.The scenic section of the model will be 15ft long and 3ft wide with two 5ft long by 18 inch wide fiddle yard boards giving a total length of 25ft. The boards will be curved to the profile of the track. At home the layout will lose one 3ft section and will operate as a roundy-round being stored either in the garage of the loft. All of the boards will be built using an adaption of the beam method using 6mm ply with the scenic boards being 3ft by 3ft to ensure that the boards are easy to manage. Although the fiddle yard boards will be one 5ft unit. The fiddle yard will be operated by train turntables with 5 roads and additional siding space to allow marshalling of stock and swapping locos without the need for handling the loco. The period that I am wishing to portray is BR WR circa 1956-9, this period I feel is the most interesting as Crimson & Cream and Maroon stock if prototypical, with older ex GWR designs and more modern MK1 stock running side by side, which I feel looks rather nice! For Horrabridge to run authentically 5 passenger and 3 goods sets are required, however additional services such as an engineer’s train and milk trains will feature in part of the sequence. Additionally the cattle market at Launceston had a quarterly grading day were a early morning cattle train would run collecting wagons from all stations. The track work will use products from Exactoscale, with steel rail being used for the scenic section and cheap Nickel Silver for the fiddle yards. I plan to use B7 point kits and gently curve the points; I’ve managed this with one by removing some of the webs and laying it over the Templot print out. Fortunately all of the point work is a very gentle curve. Rolling stock will be a mix of RTR and kit built items. The main locomotives which ran on the branch were 14xx and 64xx with auto carriages, these services terminated at Tavistock and 45xx, 4575 and 57xx working passenger and goods services to all stations on the branch. Fortunately 4 out of the 5 classes are covered with RTR models, Bachmann produce their excellent 45xx, 4575 and 57xx which initially will run with their original chassis with either Ultrascale drop in or Alan Gibson wheels, long term I will upgrade the RTR chassis with Highlevel and Comet replacements. The 14xx is an old Dapol model which will have a Highlevel chassis with a 60:1 gearbox and Ultrascale wheels. I am currently in the process of detailing the 14xx body using the Mainly Trains detailing kit and additional Alan Gibson parts. Hopefully one of the RTR manufactures will produce a 64xx before long! Passenger stock will be a mix Collett, Hawksworth and MK1 stock. I have a selection of suitable RTR stock which will be supplemented with Blacksmiths and Comet coach kits, although this is more of a long term project. Goods stock again will be a mix of RTR and kit built items. I currently have 30 or so wagons at various stages of construction, ranging from part built kits, to wagons which require painting, numbering and weathering! My own preferred method for good running is springing, I’ve built a number of wagons with Bill Bedford springing kits and Craig Welsh’s sprung chassis kit for PO wagons. I have used MJT internal rockers and W-Irons in the past, but I prefer springing, despite it taking a little longer to get a wagon running smoothly. Having said that I have a large amount of uncompensated stock, mostly RTR items which have had the 00 wheels replaced with Alan Gibson items, which run very satisfactorily.

Operation

 

I think I will stick to traditional DC control rather than DCC, it looks good, but I just feel that set up costs of several hundred pounds for a good system isn’t necessary for a layout of this size. In the future I might convert, but I doubt it.

 

The timetable has already been bashed into an operating sequence which would require three passenger sets working Plymouth to Launceston (changing loco at Launceston), a pair of auto set for Plymouth to Tavistock services, a Princetown passenger set and three goods sets. (One Tavistock and Launceston goods, and one Horrabridge and Princetown and one all station stopper)

Very often the goods services were double headed; for example the Tavistock and Launceston freight very often had a 45xx and a 57xx, the pilot loco would then work on to Launceston shunt for a couple of hours, then work back after lunch with the goods, sometimes joining the Tavistock loco, dependent on the load and how long the shunting at Launceston took.

 

Most passenger trains were two or three carriages, which by 1955 started to be newer designs and by 1957 Hawksworth stock started to appear in increasing numbers. Auto trains were a mix of Collett and Hawskworth stock, again depending on the period.

 

Well I hope this has given you an idea of what I would like to achieve, my own modelling philosophy is less is more, I like layouts which appear very quiet, and then all of a sudden burst into activity for a few minutes, then quiet again. The simplicity of the track plans and operation I feel is wonderful!

 

Anyway any comments will be greatly recieved!

4 Comments


Recommended Comments

  • RMweb Gold

Hi Nick, glad to hear you have decided to go ahead with Horrabridge.

 

The stock sounds like a real feast, including double-heading with 4571 and 57xx. Looks like you'll be able to make good use of the new Hawksworth coaches too. Mid-1950s WR is sounding more and more attractive.

 

Agree about the Gibson replacement wheels, they do make quite a difference even in OO, I find. That 14xx chassis from High Level looks superb, looking forward to seeing progress on it.

Link to comment

Glad to see the planning crystallising Nick - looks like a good prototype :) .

 

So the LBSCR layout is 'parked' for the time being then? ;)

Link to comment
  • RMweb Gold

Good to see you've settled on one project Nick ;)

 

You need to hurry up and get it finished now as I'll need something for my future P4 efforts to run on, as it'll be a long time before I build a P4 layout :blink:

Link to comment
  • RMweb Gold

Thanks for your interest chaps, I'm not going to build it to a deadline as such, but I'd rather like to get baseboards either under construction, or built by April-My of 2011 and have the track work completed by August - September 2011. I've been threading chairs onto rail now for well over 3 months and am nearing completion.

 

Hi Mikkel, yes the double heading of a 4575 and a 57xx does look rather nice, two tank locos, 15 wagons and a brake will be the maxium lenght for goods trains, which for a small branchline I think is quite impressive!

 

As for the LBSCR idea Rod, I'd still love to do that, but would be a through station, rather than a terminus as I enjoy watching trains in that landscape over shunting. Don’t get me wrong I enjoy watching shunting, but watching a train running through a landscape is for me is more interesting.

 

Your more than welcome to build some stock for the layout Brian, I can provide you with a list! :lol: ;)

 

 

  • Like 1
Link to comment

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
×
×
  • Create New...