Delph - Goods shed revisited
In order to correct some unsightly gaps in the cut out in the cork underlay, where the goods shed fits, I have temporarily re-fitted the shed. Suitable cork infills have now been fitted. Eventually, the shed will be surrounded on three sides by cobble stones. The total thickness of the cobbled area will be roughly 4 mm so as to be flush with the top of the rails. Similar to Martin Nield's description of the typical L&Y yard arrangement in the latest MRJ, the yard at Delph (ex-LNWR) had a double row of old sleepers between the adjacent rail and the cobbled area, presumably as these were easier to lift than cobbles when track maintenance was required.
Whilst the shed building was in situ, I posed a part completed banana van on the shed road to check clearance and running. All OK, i'm pleased to report. However, I'm not too sure that any part completed banana vans ever actually ran to Delph, so this may not be strictly prototypical!
The event was captured on film (well, pixels, anyway!):
Banana van just visible at the far end of the shed in this view.
Back to loco maintenance!
Dave.
- 1
2 Comments
Recommended Comments
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now