I thought about a small servicing depot for my locos so I've been having a try of the depot track plan to work out how much room it will take.
Allowing for the 2 shed roads to take 2 locos each and the fuel area to take either 3 TTAs or a loco I reckon that i can fit what i want onto a 2m by 30cm board.
I've laid the track out roughly on the kitchen table to get an idea, what do you think?
47378, 50043 and 56 try the depot for size.
obviously the setrack will go in favour of flexi.
also the concrete sleepered track will be wooden.
running it DC will be fun, lots of isolation needed i think. (complicated)
need to give some thought about which shed to use too, Hornby or Peco?
Also I'm not sure about the use of the 3 way points, they take up less room but do they look right?
Or has the whole TMD/loco service area been too over done?
time to go and think.
- 1
4 Comments
Recommended Comments
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now