Rodding rodding everywhere!


RedgateModels

727 views

An unexpected reprieve from loft insulation allowed me to get the rodding from the 'box up to the barrow crossing completed

 

blogentry-6717-0-49785500-1401550001_thumb.jpg

 

I'm pleased with the way the #8 rod dips down to the point crank then continues on to the far end of the double slip, with rod #9 running in front and over the crank :)

 

blogentry-6717-0-98194700-1401550034_thumb.jpg

 

Finally a close up of the 'box gubbins

 

blogentry-6717-0-39705400-1401550065_thumb.jpg

  • Like 6

1 Comment


Recommended Comments

  • RMweb Gold

Prep work for the next section complete - compensating links for the rodding that leads to the entry facing point and lock. and the compensating cranks for the two double slip switches. Stools are cut and laid up to the #9 crank/compensators. Update to follow once rodding is laid :)

Link to comment

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
×
×
  • Create New...