Jump to content
 
  • entries
    87
  • comments
    69
  • views
    39,586

Good Intentions


Ravenser

643 views

This posting should have been called New Year's Resolutions but that posting was cancelled due to a shortage of serviceable rolling stock and delays to the inbound service.....

 

I'm still trying to clear the decks of projects started last year, before starting anything new . However one small project - a rework of an old Mainline GW Mink to supply a van for parcels tail traffic for the steam stock - has slipped through the net and is now at the weathering stage.

 

blogentry-80-0-37305000-1423429901.jpg

 

Still outstanding is completion of the NRX van conversion, which is almost there; the Baby Deltic, which has a nearly finished body and much of the chassis done; and a final matt varnish coat on the two Shark brake vans (one Cambrian and one Hornby)

 

That leaves on the bookcase the long-term inhabitants: a mostly finished Bratchill 150 missing one etched window frame, a Hornby Pacer rebuild which I started and haven't finished, the Smallbrook WD road van, and a partbuilt vintage Parkside kit for an LNER Toad B . Since the Smallbrook kit is resin and I only dare work that outside, that kit will have to wait for warm light days. There is also a Branchlines 04 chassis kit part built and a part built etched brass LNER van (a DOGA starter kit) that have both been stalled for years, and are hardly on the to-do list at all....

 

Of that lot, only the Pacer would definitely be of immediate use and I really ought to finish it off this year.

 

In the meantime income may again be tight this year, so yet again I'm resolved not to go out spending on new projects. Despite my best resolutions 2014 saw various acquisitions - a GBL Jinty and Butler Henderson (plus a cheap Hornby 0-6-0T to motorise the latter), a Bachmann J11 and 10001 , both of which ought to be weathered at some point. But at least not much money was spent , and I'm not planning any RTR acquisitions this year (unless Bachmann somehow deliver a C12 for Christmas or Charlie Petty does a W Yorks 144 in early red).

 

I've got quite enough stuff to sort out already.

 

The first new project is slated to be an Iain Kirk 51' LNER full brake , which is needed to complete a proper steam age parcels train. The Hornby LMS CCT can be weathered at the same time.

 

I've got a number of locos which are in need of decoders and new couplings , and weathering or rework.

Top of that list is a Hornby Fowler 2-6-4T which would address the noticeable shortage of steam traction in the steam era (and the total lack of LMR steam on an allegedly LMR layout). I also need, finally, to face up to putting a decoder in my Bachmann Standard 4MT 2-6-0. Chipping the Lima 37 (which will need detailing up) and the dormant 29 , which needs some small repair, is rather less urgent.

 

A rummage through all my boxes at New Year in search of something else turned up treasure - both the packets of MTK 155 underframe castings I bought at DEMU Showcase a few years ago from the late Alaister Rolfe. They were in separate boxes, which is why I had become convinced I had only bought one packet.

 

The importance of this is that Sprinter DMU underframe castings are a key detailing item currently completely off the market. Hurst Models has quietly slipped into an almost dormant state, and seems unlikely to reappear - it looks very much as if a few residual items are being slowly cleared. That has removed their 156 castings from the market. And although the MTK moulds passed with the rest of NNK to Phoenix Precision, the castings are known to be split over several moulds and though Phoenix would like to rerun the 155 castings, they admit they don't actually know on which moulds they are to be found....

 

So - a full scale rework of the elderly W Yorks 155 is on the cards. It's always run surprisingly well, but it's currently stopped because the black box fouls some of the dummy point motors I installed 18 months ago. I'm fully aware this is an attempt to make a silk purse out of a sow's ear, but with a detailed underframe, a full (and painted) interior, a fake painted solebar, detailed gangways, close coupling, Kadees and lighting I might get something passable. The biggest unsolved issue is probably flushglazing.

 

Then there are a clutch of electrical projects to finish.

 

The external CDU for the boxfile is done, and attention turns to Tramlink, where one board needs rewiring as the feed wire has come off its connection. Arguably the whole thing needs rewiring , to install point motors, a better interboard board connector, attach the external CDU , and probably relay one point.

 

There is an Erkon ground signal to build for Blacklade, with a decoder to install to work it - and I might build the spare colour light kits as route indicators for the fiddle yard roads

 

This is before I even contemplate the possibility of dabbling with some trams, and then there's the idea of building the Judith Edge Vanguard Steelman kit - I'm sure I have a suitable Beetle in stock

 

 

The 108 needs weathering and populating, the station building needs finishing.......

 

I really mean to build the 128 kit this year

 

Plenty to keep me busy , even if I find I have a little more time this year

  • Like 2

0 Comments


Recommended Comments

There are no comments to display.

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
×
×
  • Create New...