Jump to content
 
  • entries
    33
  • comments
    51
  • views
    13,075

Topping off some Tunnel Portals (a small rainy day job)


anroar53

1,066 views

One of the jobs I have been meaning to do for ages was to add some castellated ornaments above my representation of Linslade Tunnels. As I didn't have enough space to recreate the gap between the Up and Down Fast Lines at the real location I had to settle on a slightly different arrangement, and my Tunnel has four instead of three towers. Hopefully the end result looks something like the real thing?
blogentry-31978-0-91194400-1538113917_thumb.jpg
Making up the castle towers using leftover bits of cardboard and embossed plasticard.
blogentry-31978-0-86601200-1538113933_thumb.jpg
Adding some thin plasticard strips on the completed towers, and the joining curtain walls
blogentry-31978-0-00067700-1538113971_thumb.jpg
Completed sections painted, just requiring some weathering powder to tone down the paint.
blogentry-31978-0-87166800-1538113989_thumb.jpg
Centre section added over the Up Fast/Down Slow Line portal
blogentry-31978-0-10136300-1538114006_thumb.jpg
Completed towers and walls added, some extra weathering added to the Tunnels to try and blend the new additions together. Some 'clump' foliage added to hide the gaps with the original scenery
blogentry-31978-0-87507800-1538114066_thumb.jpg
All finished ! It took about seven hours work spread over four days to complete.

  • Like 9

1 Comment


Recommended Comments

  • RMweb Premium

A very imposing tunnel Mouth. 

 

Imagine how much you could make renting them out as holiday homes for trainspotters.... 

Link to comment

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
×
×
  • Create New...