Jump to content
 

Time to Start Track Building


RedgateModels

289 views

Well after a quite a while getting back to grips with Templot and a LOT of help from @martin_wynne I have a track plan finalised.

 

DSC_0979.JPG.5c1fe8016d09e225bb0f6d4d37bb8b75.JPG

 

There will be some changes in levels, as the exit road(s) will have a small incline through a rocky cutting and the siding leading off the Y will be for side tippers unloading into to conveyor that takes spoil over the loop track onto the raised hillside at the back. 

 

It really got complex at the front of the layout, with all that mixed gauge trackwork and even a couple of "half K" arrangements so that it is impossible to set a road that causes derailments - also meant that the narrow gauge exit from the dual gauge does not need any moving switch blades :)

 

DSC_0981.JPG.7b2ed2319d720a6e2174ee6910434d98.JPG

 

The half K on the right is wrong I know, I might have yet another go before I start building, but the roller gauges will help me position it better anyway. Oh and it's OO-SF, I'm hoping that the 1mm flangeways will not lead to too much wheel drop of the OO-9 stock. I might be able to tweak some of them to 0.75mm depending on back to backs etc, we shall see.

 

Edited by RedgateModels

  • Like 4

2 Comments


Recommended Comments

Good luck with the project, dual gauge trackwork is something I would like to have a go at, but too many other interests. Been trying to follow the Templot design thread topic and am looking forward to see the progress

  • Like 1
Link to comment

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
×
×
  • Create New...