Pipework and Valves Finished
well, for now at least.
All the main components are in place and plumbed up
Handrails and the regulator linkages next then it's probably deflectors.
The chassis needs revisiting as the lubricator supports are still missing and I'd like to add the sandbox filler tubes and possible a sandbox or two between the frames - all fixed to the boiler lower. I've plenty of exhaust steam pipe left to add a representation of it emerging from between the frames up to the running plate before it then drops to the injector.
7 Comments
Recommended Comments
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now