Getting to the Point
Following a shopping trip at Wycrail 10 a Peco SL-E191 short radius point and a pack of PL-9 mounting bases hit the workbench.
So last night whilst watching TV I prepped the point before fitting it to the layout (a bit of a first). The pic below shows what I do to all electrofrogs, nothing new, it's all in the accompanying leaflet, apart from the hacking off of the solenoid mounting points!
I've also fitted the solenoid (an old PL10 with extension pin, bought way before they did a PL10E) to it's mounting base and sorted out a microswitch and mounting block to do the frog switching.
So, next job is to spray the point matt black before digging up the cinders ballast ready to lay it in place.
Edited by RedgateModels
- 2
5 Comments
Recommended Comments
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now