Jump to content
 

Danemouth Mk 4


Danemouth

Recommended Posts

Well progress has been made!

 

Tracklaying is complete, points Cobaltted and the whole lot wired.

 

I've even programmed the routes into the Powercab and tested them. This is what it currently looks like

 

post-7048-0-36113700-1476198114_thumb.jpg

 

Autotrain in the Bay and B set with 4507 in the main platform

 

post-7048-0-59406500-1476198127_thumb.jpg

 

post-7048-0-88196500-1476198148_thumb.jpg

 

And the fiddleyard with Operational diagram above

 

post-7048-0-88495300-1476198136_thumb.jpg

 

Danemouth Operating Diagram.pdf

 

Over the next couple of weeks I intend to do some playing trains  operational testing particularly goods operations to ensure the layout fulfills my needs before starting on the scenery

 

Regards,

 

 

Dave

Link to post
Share on other sites

  • RMweb Premium

Well progress has been made!

 

Tracklaying is complete, points Cobaltted and the whole lot wired.

 

I've even programmed the routes into the Powercab and tested them. This is what it currently looks like

 

attachicon.gifDSC14306.jpg

 

Autotrain in the Bay and B set with 4507 in the main platform

 

attachicon.gifDSC14307.jpg

 

attachicon.gifDSC14311.jpg

 

And the fiddleyard with Operational diagram above

 

attachicon.gifDSC14308.jpg

 

attachicon.gifDanemouth Operating Diagram.pdf

 

Over the next couple of weeks I intend to do some playing trains  operational testing particularly goods operations to ensure the layout fulfills my needs before starting on the scenery

 

Regards,

 

 

Dave

Good work Dave. It has a nice open look.

Link to post
Share on other sites

Archived

This topic is now archived and is closed to further replies.


×
×
  • Create New...