Fishplate Posted June 23, 2023 Share Posted June 23, 2023 Very nice. Thank you for sharing the construction details. I have bookmarked your post for future reference. 1 Link to post Share on other sites More sharing options...
Johndc120 Posted June 30, 2023 Author Share Posted June 30, 2023 Last night we made good progress with the ballasting, we managed to get the ballast in and tamped down on the platform line and also the first section of the concrete pot sleepers They make for an interesting track design and I’m glad we included them, once the ballast is glued we’ll add the tie bars which will hopefully make them look more like a track system rather than just 2 rails 18 Link to post Share on other sites More sharing options...
Johndc120 Posted July 13, 2023 Author Share Posted July 13, 2023 Tonight’s work has been to copy (with some modeller’s licences) a drainage channel which takes water from a small drain above which will run alongside the farm lane into an underground culvert. The real this is on a disused section of the Penarth to Cadoxton line and it collects water from a low point in the fields above and directs it into the drainage cess on the south side This certainly inspired us to think about drainage more seriously on the layout as it’s not often modelled 11 6 Link to post Share on other sites More sharing options...
Recommended Posts
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now