RSS Fetcher Posted March 15, 2010 Share Posted March 15, 2010 Finally got round to painting the retaining walls along the edge of the LM yard. About 9 foot of it.. It was all painted in a concrete colour, allowed to dry then a colour mixed about 50/50 matt black and Humbrol 26 ("leather" I think) brushed diagonally over the raised bits. took about 3 and a half hours including brew breaks. I think it looks ok. Steve's now started the GW station track laying. The station throat board is removeable at the moment, so it can taken down for wiring and fixing up the point motors. It will then be fastened down permanently in the hope that nothing fails below the basebord View the full article Link to post Share on other sites More sharing options...
Recommended Posts
Archived
This topic is now archived and is closed to further replies.