Jump to content
 

Blog- The Saltney Railway - Saltney. It's all a load of walls


Recommended Posts

Finally got round to painting the retaining walls along the edge of the LM yard. About 9 foot of it.. :blink:

 

blogentry-7179-1268682597.jpg

 

blogentry-7179-12686825393.jpg

 

blogentry-7179-126868258617.jpg

 

blogentry-7179-126868254568.jpg

 

blogentry-7179-126868255826.jpg

 

It was all painted in a concrete colour, allowed to dry then a colour mixed about 50/50 matt black and Humbrol 26 ("leather" I think) brushed diagonally over the raised bits. took about 3 and a half hours including brew breaks. I think it looks ok.

 

Steve's now started the GW station track laying. The station throat board is removeable at the moment, so it can taken down for wiring and fixing up the point motors. It will then be fastened down permanently in the hope that nothing fails below the basebord :lol: :lol: :lol:

 

blogentry-7179-126868255215.jpg

 

View the full article

Link to post
Share on other sites

Archived

This topic is now archived and is closed to further replies.

×
×
  • Create New...