Jump to content
 

Nevada city fire station in HO


 Share

Recommended Posts

Starting a new project...

34066727820_24028d64c6_b.jpg

A really old kit that I bought a while back.

It´s going to be fun to build a really old craftsman kit. Printed cardboard, some stripwood and a lot of instructions....

:sungum:

34066727780_49b2bd3cb1_b.jpg

  • Like 1
Link to post
Share on other sites

Spent many an hour or two in the Gold Country while we lived in Calif. and remember it before the tourists came when it became overcrowded and too busy.  There was/is a good pasty shop in nearby Grass Valley thanks to the Cornish connection!

 

Brian.

  • Like 2
Link to post
Share on other sites

That would have been good Brian.

The fire station kit build has begun...

Cutting the windows and doors. A new blade was definitely a must

The walls was a pain to cut out in 1/8" cardboard.

I have glued the brick faces to the cardboard, and they are now drying under a ton of lead weights....

 

33664846293_1789155e7e_c.jpg

Link to post
Share on other sites

 

Been building the wall details.

 

34328612432_0041f9a439_c.jpg

The brick surround is cardboard.

 

34358327741_9e12f423e3_c.jpg

Doors....

 

34358328001_735faa1dff_c.jpg

The gables are almost finished.

 

34358326641_1740efc3fa_c.jpg

Painting bricks.... The walls are quite large, so it's going to take a while.

  • Like 2
Link to post
Share on other sites

This is how I did the walls:

 

 

 

I primed them with burnt sienna and then picked some bricks in lighter and darker colors.

 

Note that they are way to strong in contrast at this stage.

 

 

 

34333562222_6f9cfd04cc_c.jpg

 

I then lightly Airbrushed some of the base color to tone down the bricks.

 

34108693550_2b020dc0cf_c.jpg

 

To make the mortar, I painted the walls with warm gray oil paint straight from the tube.

 

34108692360_a0fb1fe583_c.jpg

 

I then wiped it off while wet.

 

I lastly used a towel that was very lightly damped in mineral spirits to remove the oil paint from the brick surfaces.

 

33683942393_1c4a1aac53_c.jpg

 

34493920375_d003e7b294_c.jpg

 

Just the way I liked it.

  • Like 2
Link to post
Share on other sites

The fire station build continued.

 

33665862104_085ea8d02f_c.jpg

 

I've assembled the walls and built the windows and doors.

They are mostly made out of cardboard with printed plastic glass.

 

33698077813_6f9eda0aea_c.jpg

 

The embossed brick walls were a real chore to work with....But it worked out okay.

 

33698079513_62c894e782_c.jpg

 

 

33698082393_825ef9e256_c.jpg

  • Like 2
Link to post
Share on other sites

Finished!!!

The HSM Nevada city fire station is done!

It was a real challenge, but it went really okay I think.

The bell tower has 28 parts.... Fiddly, to say the least.

The interior light is a led mounted above the ceiling and has an orange colored diffuser to make it resemble gas light.

 

34401718472_7e583d33ac_c.jpg

 

34433249711_cb325f4a58_c.jpg

 

34401716422_8011ca2bd5_c.jpg

 

34522267726_d43b444367_c.jpg

 

34522262766_ea2dc8958d_c.jpg

 

34522265346_73f81d8e67_c.jpg

 

34401722542_e1e70fb81a_c.jpg

 

33753150103_36924f68bd_c.jpg

  • Like 4
Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
 Share

×
×
  • Create New...