RSS Fetcher Posted December 10, 2018 Share Posted December 10, 2018 Removed the remaining panels this afternoon, and checked out the supply connections to the related track lengths and points: Final tally; five or 6 rail lengths and two sets of points to be individually wired, but some lengths of track (virtually out of reach with the side panels fitted) need to be cleaned and polished. Recovery work starts tomorrow. Attached thumbnail(s) View the full article Link to post Share on other sites More sharing options...
Recommended Posts