Gloucester Road Posted May 4, 2010 Share Posted May 4, 2010 As stated in my blog "Gloucester Road" progress on the construction of Scalescenes Small Corner Shops can be followed here. First will be just the store fronts, then with the corner shop itself in full size. Day one: the base layer Day two: the base cover layer (wall covering) and the store fronts have been added. The store fronts are built up in layers and give a real sense of depth to the front (even in n); window,doors and curtains have also been added. I think the fish and chips sign needs to be straighted. yup curtains, blinds and doors Hopefully more tomorrow/ Link to comment Share on other sites More sharing options...
Tel2010 Posted May 4, 2010 Share Posted May 4, 2010 Looking good,ive got this kit too,in brick,the stone looks realy good. Currently i have only built the corner building as a pub.The insides do have some nice details and can easily be added to ,like bits of clear sprue for glasses and beer pumps in mine and chairs and bed made from dass clay in upstairs rooms . I look forward to seeing how yours progresses ) Terry Link to comment Share on other sites More sharing options...
Gloucester Road Posted May 5, 2010 Author Share Posted May 5, 2010 Tel2010, nice job finishing the pub, not sure if I can add that fine a detail in "n"but gives me something to aim for. Finished off the interior walls and test fitted them in place today. Interior walls and them in place and a close up Link to comment Share on other sites More sharing options...
Tel2010 Posted May 5, 2010 Share Posted May 5, 2010 Tel2010, nice job finishing the pub, not sure if I can add that fine a detail in "n"but gives me something to aim for. Finished off the interior walls and test fitted them in place today. Interior walls and them in place and a close up Thanks Gloucester Road,whoops missed the n gage bit,but they dont look it ). Your street coming along nicely Terry Link to comment Share on other sites More sharing options...
Gloucester Road Posted May 7, 2010 Author Share Posted May 7, 2010 Day four : finished off the floors, ceilings, and rear walls and started putting the roof together. Two of the four roof pieces with tiles clued on here they are in place on my bench: and a close up: and sitting back on the layout: Need to finish off the roof, drain pipes, wall capping and chimneys. Link to comment Share on other sites More sharing options...
Stuart-AU Posted May 7, 2010 Share Posted May 7, 2010 HI.. Looks good, I'm working on a set but in 3mm for a up and come layout.. Stuart in OZ Link to comment Share on other sites More sharing options...
Recommended Posts
Archived
This topic is now archived and is closed to further replies.