Steamluvr Posted April 15, 2020 Share Posted April 15, 2020 A bit of an assembly conundrum... If I read instructions correctly, the boiler front mounts to the footplate with a screw and nut -the nut being inside the boiler. However, once the smokebox door is fastened in place, how do you disassemble to paint? Perhaps the nut inside the boiler must be expoxied into place? Thanks Link to post Share on other sites More sharing options...
doilum Posted April 15, 2020 Share Posted April 15, 2020 I took a different route with St Frusqin. To aid painting and maintenance, the footplate, once painted black, was semi permanently fastened to the frames. The boiler is bolted to the cab with a custom made bracket at the rear. At the front, the chimney is grilled out and fitted to a plastic blast pipe. This allows it to be secured Triang style to captive nut on the foot plate. Link to post Share on other sites More sharing options...
Recommended Posts
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now