Jump to content
 

BSC Bromford Bridge tube works exchange sidings


 Share

Recommended Posts

Having acquired some baseboards  I've decided to make a small layout based on the exchange sidings at BSC Bromford Bridge , the layout will be 6ft 2" long by 22" wide . Traffic will be ingot in using SPA  , IGA bogie Cargowaggons and BDA wagons for outward tube traffic , a Bachmann class 08 for bringing the traffic in , with a Hornby Sentinel for internal traffic  , may add a few SSA and HSA scrap wagons to add interest . Does anyone know what year the works closed or have any additional information on the location .

IMG_20220721_182600.jpg

IMG_20220721_182618.jpg

Edited by bazjones1711
  • Like 2
Link to post
Share on other sites

Have you seen this photo:-

https://www.flickr.com/photos/69947186@N08/8090725840

Outbound tubes might also be carried in OBAs; when the prototype conversion was carried out, the wagon was given a TOPS code in the 'S' series, and was referred to in a BR publication as an 'air-braked Tube'. Tube traffic was the reason behind fitting the extended ends and the side stanchions.

  • Informative/Useful 1
Link to post
Share on other sites

  • 8 months later...

Good Friday modelling , BSC Bromford Bridge starting to come together slowly , I have  planned the sequence of the jobs to be done over the next few days , sort of goes to plan ... Last bit of ballasting on Sat , then I can weather the track and spray the sides of the rails . Container cabin sprayed and weathered , this will be on the left hand side of the layout near the road bridge . Hope to get the roadway down along with a basic road bridge , plus but more grass along the tracks .

 

IMG_20230407_185146_kindlephoto-427446.jpg

  • Like 7
  • Craftsmanship/clever 1
Link to post
Share on other sites

Bit more modelling on the layout  , all trackwork now ballast and weathered , now onto the scenery , a lot of the grass now done , next modelling session will involve the likes of the road bridge , elevated motorway , fencing ect . The scenery should  be  finished by time of its debut outing in August , with just the stock to detail and weather over the next few months .

 

 

 

IMG_20230408_151137.jpg.24c96f9127f5eca13810fcb7fb603cad.jpgIMG_20230407_185017.jpg.792f9ab669f8f8839da568d986781346.jpg

  • Like 6
Link to post
Share on other sites

  • 4 weeks later...

Interested to see this one develop, I worked at BSC Clydesdale from 1974 to 1986 and was very familiar with all the tube products.

 

This view shows part of the large yard next to thd works.  My office was part of that row in front of the mill.  Sadly all gone now

tubeyard.jpg.05571c4d6abe7f53699722226fd5fdd1.jpg

 

jim

  • Like 5
Link to post
Share on other sites

  • 5 months later...
  • 5 months later...

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
 Share

×
×
  • Create New...