pedanticmongrel Posted October 29, 2009 Share Posted October 29, 2009 Work has started on the New Wenchford Railway, with the help of 2 other forum members I have managed to go from nothing to 2 mainlines laid and wired in just 3 days. here are some pictures and a video showing what the layout looks like so far. Video here http://www.youtube.com/watch?v=A-2zuMGUhQY Link to post Share on other sites More sharing options...
pedanticmongrel Posted October 29, 2009 Author Share Posted October 29, 2009 Work has been progressing further at Wenchford, more track has been laid today, along with building of 2 panels ready for switches and disgrams to be installed. the the return loop was wired up and the first locomotive (5972) passed from the inner mainline to the outer using the return loop. Finally some buildings were unpacked and pre-positioned to get a rough idea what Crotchley station will look like when built. Some pictures; Link to post Share on other sites More sharing options...
pedanticmongrel Posted October 29, 2009 Author Share Posted October 29, 2009 Work has been continuing at Wenchford, wiring is slowly progressing as well as track laying, not that I haven't also been playing trains, here are some pictures. Link to post Share on other sites More sharing options...
pedanticmongrel Posted October 29, 2009 Author Share Posted October 29, 2009 Work has been progressing at Wenchford, some new photos. Link to post Share on other sites More sharing options...
pedanticmongrel Posted October 31, 2009 Author Share Posted October 31, 2009 Work has been carrying on, wiring is a very slow task, points and isolating sections are slowly getting added to the control panel. And of course some more trains have been run. Link to post Share on other sites More sharing options...
pedanticmongrel Posted November 5, 2009 Author Share Posted November 5, 2009 Some corners of Wenchford are starting to look a bit more scenic, namely Crotchley station, also with the help of Matt (forum member with the Horsted Keynes- East Grinstead layout) ballasting has started at a grand scale here. Pictures; Link to post Share on other sites More sharing options...
JonnyGT Posted November 5, 2009 Share Posted November 5, 2009 Plently of space you have Looks great. Keep up the good work. Link to post Share on other sites More sharing options...
pedanticmongrel Posted November 5, 2009 Author Share Posted November 5, 2009 construction has been taking place on the other through station on the layout, Meadhampstead Central. The platform is finished and so is main station building but the road overbridge to get to it still isn't finished. You might be able to tell which real station this station is loosly based on. Also I think you may agree it could be any more different from Crotchley station. pictures; Link to post Share on other sites More sharing options...
pedanticmongrel Posted November 9, 2009 Author Share Posted November 9, 2009 Work has been continueing on wenchford, ballasting works has taken place and more point motors have been added, also some painting and scenery work has been done too. Some pictures. Link to post Share on other sites More sharing options...
pedanticmongrel Posted November 11, 2009 Author Share Posted November 11, 2009 Today I have been working on the road access bridge to Meadhampsted Central station. Link to post Share on other sites More sharing options...
agentskj Posted November 11, 2009 Share Posted November 11, 2009 A strong start to go from nothing to that in 3 days is something well done keep going and you will have something very special Sam Link to post Share on other sites More sharing options...
pedanticmongrel Posted November 11, 2009 Author Share Posted November 11, 2009 A strong start to go from nothing to that in 3 days is something well done keep going and you will have something very special Sam thanks, but i have now been working on it for nearly 3 weeks, only what is seen in the first post in this thread was 3 days work. Link to post Share on other sites More sharing options...
pedanticmongrel Posted November 13, 2009 Author Share Posted November 13, 2009 Today I was going to carry on with scenery but a week of day shifts has taken it's toll and I decided to renumber my 2-8-0 Austerity instead. It is now 90733 because I was impressed with the real thing when I saw it at the GCR Gala back in october. Link to post Share on other sites More sharing options...
RMweb Gold papagolfjuliet Posted November 14, 2009 RMweb Gold Share Posted November 14, 2009 Lovely stuff. What did you use as the basis for that S160-a-like? Link to post Share on other sites More sharing options...
pedanticmongrel Posted November 15, 2009 Author Share Posted November 15, 2009 Lovely stuff. What did you use as the basis for that S160-a-like? it's a Bachmann Spectrum "Consolidation" underneath, and I am thinking about selling it if you are interested. Link to post Share on other sites More sharing options...
pedanticmongrel Posted November 17, 2009 Author Share Posted November 17, 2009 I bought some new batteries for my camera today, and to mark the occasion i took some photos of my attic and layout to show what it looks like now, a vast change from what it was like before. Link to post Share on other sites More sharing options...
pedanticmongrel Posted November 18, 2009 Author Share Posted November 18, 2009 A New locomotive has arrived at Wenchford ready for restoration. It is a Hornby 28xx that will when finished be loco drive. For the moment though it is sitting awaiting restoration. Link to post Share on other sites More sharing options...
pedanticmongrel Posted November 22, 2009 Author Share Posted November 22, 2009 The Joys of Modrock, been building the mountain; Link to post Share on other sites More sharing options...
pedanticmongrel Posted November 24, 2009 Author Share Posted November 24, 2009 Been working on the scenery in one corner of the layout, some pictures: Link to post Share on other sites More sharing options...
pedanticmongrel Posted November 25, 2009 Author Share Posted November 25, 2009 I have finished my loco drive 28xx today, but it still needs it's own tender and the brass cabside plates (on order) for now though it went on some test runs with the tender from 6856. Link to post Share on other sites More sharing options...
pedanticmongrel Posted November 26, 2009 Author Share Posted November 26, 2009 I was waiting for the modrock mountains to dry today so i finished of the 28xx 2857 and ran a few trains, pics; Link to post Share on other sites More sharing options...
pedanticmongrel Posted November 27, 2009 Author Share Posted November 27, 2009 Today a fellow forum member came over and ran his 02 Tank W24 Calbourne at Wenchford, I also painted the hills with the first coat of green paint, here are some pics and a link to a video showing the layout in operation. Video here: http://www.youtube.com/watch?v=9ka3wGwLijQ Link to post Share on other sites More sharing options...
St. Simon Posted November 28, 2009 Share Posted November 28, 2009 Hi, Looking good! Keep up the good work! Simon Link to post Share on other sites More sharing options...
Rammy Posted November 28, 2009 Share Posted November 28, 2009 I agree. You're making great progress. Looks like you have a nice little setup there in your loft. Keep up the good work Dave Link to post Share on other sites More sharing options...
pedanticmongrel Posted December 4, 2009 Author Share Posted December 4, 2009 Just finished renumbering the latest addition to the wenchford loco fleet, 30926 Repton. Link to post Share on other sites More sharing options...