RMweb Premium jbqfc Posted October 31, 2011 Author RMweb Premium Share Posted October 31, 2011 (edited) hi all an up date for you some basic scenic work started here fuel area has been weathered some work on the back scene but not very happy with it the photo printed out to light Edited January 4, 2023 by jbqfc to replace photos Link to post Share on other sites More sharing options...
RMweb Premium jbqfc Posted December 3, 2011 Author RMweb Premium Share Posted December 3, 2011 (edited) Hi all a bit off an update i have added a 5 inch extension to the front to bring the boards out level with the control panel below some general pictures of my model room Edited January 4, 2023 by jbqfc to replace photos Link to post Share on other sites More sharing options...
RMweb Premium jbqfc Posted May 14, 2012 Author RMweb Premium Share Posted May 14, 2012 (edited) hi all after not doing much for a couple of months i am now getting on with more ballast bases in for the sheds bases in for the sheds Edited January 4, 2023 by jbqfc to replace photos Link to post Share on other sites More sharing options...
RMweb Premium jbqfc Posted June 11, 2012 Author RMweb Premium Share Posted June 11, 2012 (edited) hi all ballasting is now all most complete i have got on very well in the last two months Edited January 4, 2023 by jbqfc to replace photos 1 Link to post Share on other sites More sharing options...
shanks522 Posted June 11, 2012 Share Posted June 11, 2012 Really nice neat ballasting there, coming to life nicely. Graham. 1 Link to post Share on other sites More sharing options...
RMweb Premium jbqfc Posted April 6, 2013 Author RMweb Premium Share Posted April 6, 2013 (edited) Hi all it's been a while not to much work done as I lost interest as the small length of the fiddle yard tracks where spoiling operation at 2am I awoke with an idea a lift out fiddle yard extension so I set to work in stored position first part in place second part in place supports and end stops removed stock rakes joined back up in all takes about ten minutes to set up and take down lot's more pictures can be found here http://www.flickr.com/photos/queenfanjohn/collections/72157628018515320/ Edited January 4, 2023 by jbqfc to replace photos 3 Link to post Share on other sites More sharing options...
shanks522 Posted April 6, 2013 Share Posted April 6, 2013 Very clever, what a good solution, just hope no one opens the door. Graham. Link to post Share on other sites More sharing options...
RMweb Premium jbqfc Posted April 28, 2014 Author RMweb Premium Share Posted April 28, 2014 (edited) Hi all having built a lot of wagon kits and detailing RTR stock and locos I am back working on the layout so a update depot area now with weathered track I have weathered all the yard tracks park with new wall fitted Langley models band stand Edited January 4, 2023 by jbqfc to replace photos Link to post Share on other sites More sharing options...
RMweb Premium jbqfc Posted January 7, 2018 Author RMweb Premium Share Posted January 7, 2018 (edited) Hello all it has been awhile due to ill health not been up to doing much but i have for the time been i have got my colitis under control i have done a complete of the rebuild of the back scene and replaced the factory units with a department store a shop and hotel area 8 by john brace, on Flickr now hopefully i can continue to be well and get more work done including a large back load of rolling stock work Edited January 7, 2018 by jbqfc 2 Link to post Share on other sites More sharing options...
RMweb Premium jbqfc Posted May 24, 2020 Author RMweb Premium Share Posted May 24, 2020 still not much modelling getting done due to my health but i did do a bit of work back in May 2018 but not done an update N gauge model railway Deacon road by john brace, on Flickr John 2 Link to post Share on other sites More sharing options...
RMweb Premium jbqfc Posted January 4, 2023 Author RMweb Premium Share Posted January 4, 2023 (edited) well after yet another long brake giving the garden a major rebuild have found my mojo again before i started work i have removed the long thin are of ballast to be replace with hard standing and added some portacabins removed area filled another area filled another odd area of ballast removed i have also start putting in a back scene made up using phots of the Metcalf card kit i have used I did one using phots of actual buildings but that looked a bit odd I have replaced the photos in this thread John Edited January 4, 2023 by jbqfc spelling 1 Link to post Share on other sites More sharing options...
RMweb Premium jbqfc Posted January 5, 2023 Author RMweb Premium Share Posted January 5, 2023 made more progress today both areas fill and a quick cote of paint some flock round the base of the container portacabins and the grounded CCT the platform have also been repainted John 2 Link to post Share on other sites More sharing options...
RMweb Premium jbqfc Posted January 15, 2023 Author RMweb Premium Share Posted January 15, 2023 (edited) The mojo is still strong lots more works done edging on to platforms road painted and marked flock on between the tracks walls road paths and gardens done walls road paths and gardens done and just to be seen is a star of work on a low relief mill John Edited January 15, 2023 by jbqfc spelling 3 Link to post Share on other sites More sharing options...
RMweb Premium jbqfc Posted February 2, 2023 Author RMweb Premium Share Posted February 2, 2023 My mojo is still going strong put a second story on the station building put in the rest of the back scene and marked out the car park John 3 Link to post Share on other sites More sharing options...
RMweb Premium jbqfc Posted November 22, 2023 Author RMweb Premium Share Posted November 22, 2023 not been doing much to the layout but have been getting on with the large back log of RTR to weather and fit dg couplings to then I made a restart on some half done kits and conversions also now got my self a semi permanent work bench in the model room that can be left up all the time so no setting up and taking down on the dining room table this has meant i am now doing a lot more modelling as the chore of setting up used to put me off this can be stored away under the layout when I want to work on the layout or run trains some Langley traction engine kits John Link to post Share on other sites More sharing options...
RMweb Premium jbqfc Posted February 29 Author RMweb Premium Share Posted February 29 not much done to the layout but been working on a lot of stock conversions and rebuilds olds style Graham Farish MK 2 coaches repainted as BRML Doncaster test train using railmatch paints and fox transfers this started life as a model zone limited edition of test car five a Graham farish MK 1 BSK pantograph well fitted to the roof with a Dapol pantograph fitted roof painted white B4 bogies replaced with Graham farish BT10 bogies Lab coach 6 Prometheus RDB975422 John Link to post Share on other sites More sharing options...
Recommended Posts
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now