Time to put the building together...

 

Here are the front and side elevations in there painted state with the glazing and doors added.

 

blogentry-6970-1264150774326_thumb.jpg

 

 

blogentry-6970-1264150774326_thumb.jpg

 

 

The internal structure is made from 2mm mdf, slotted together and glued. I have given the viewable internal walls a coat of grey primer.

 

blogentry-6970-12641508249156_thumb.jpg

 

 

The corners of the walls are mitred together at 45 deg... here is a shot especiall for Missy - to show the corner joint.

 

blogentry-6970-12641510484007_thumb.jpg

 

 

The roof sub structure ties the whole building together using the laser cut tabs shown in the photos. I will add the final roof structure using 20 thou plasticard before adding the tiles. The kit provides several sheets of laser cut tiles made from adhesive paper. I have not used this method before, having constucted prevoious buildings individual tiles made from 5 thou plasticard. I will report later on progress with the roof and tiling.

 

blogentry-6970-12641513665511_thumb.jpg

 

 