RSS Fetcher Posted January 22, 2010 Share Posted January 22, 2010 Time to put the building together... Here are the front and side elevations in there painted state with the glazing and doors added. The internal structure is made from 2mm mdf, slotted together and glued. I have given the viewable internal walls a coat of grey primer. The corners of the walls are mitred together at 45 deg... here is a shot especiall for Missy - to show the corner joint. The roof sub structure ties the whole building together using the laser cut tabs shown in the photos. I will add the final roof structure using 20 thou plasticard before adding the tiles. The kit provides several sheets of laser cut tiles made from adhesive paper. I have not used this method before, having constucted prevoious buildings individual tiles made from 5 thou plasticard. I will report later on progress with the roof and tiling. View the full article Link to post Share on other sites More sharing options...
Recommended Posts
Archived
This topic is now archived and is closed to further replies.