LNERGE Posted February 7, 2014 Share Posted February 7, 2014 I've been planning to rebuild my model railway for a while. The chance came over Christmas with an extended period of leave of nearly a month. The arrival of twins would be the main focus for the period but Mrs LNERGE promised me time to play. The main bulk of the layout is constructed and trains have run but there were a few thing's i wanted to play with before going too far, the major item being block occupancy detectors. Here is a movie of the temporary box diagram showing firstly a propelling move from Upper Junction to Summit Box starting from the down main and crossing to the up. The short train is then hauled via the Summit crossover back to Upper Junction via the up main.. The revised box diagram is here which at the time of capture was nearly right.. Link to post Share on other sites More sharing options...
Recommended Posts
Archived
This topic is now archived and is closed to further replies.