RSS Fetcher Posted October 15, 2009 Share Posted October 15, 2009 Still no actual track laid, but I am edging slowly towards it! To provide some strength to the track at board joints, and hopefully prevent rail end damage during assembly and disassembly of the layout, I'm fitting a couple pf ply sleepers where each track reaches the end of a board with brass panel pins driven into the board top rather than the usual rivets. This is now complete except for one end of one board. After that, I need to partially cover the turnout operating unit holes to just leave a slot for the actuating wires to pass through, locate the TOU's under the boards and then track laying can start. Here's 3 photos of recent progress. Dave. View the full article Link to post Share on other sites More sharing options...
Recommended Posts
Archived
This topic is now archived and is closed to further replies.