Adamphillip Posted August 15, 2014 Share Posted August 15, 2014 so since my last OO layout Axbridge had to be taken down my dad is now letting me into the loft to build my next layout. I decided that i'd widen my time period so that i would have a large variety of stock to choose from. the main station will disappear under a road bridge where the main station building will be while the station throat will have a 2nd bridge over it, the entire layout will have retaining walls as a back scene. the station will be a 4 track through arrangement with a dedicated fright loop and yard that is access under the bridge, on the other side of the loft there will be a MPD with a turn table and large shed/servicing facility. Link to post Share on other sites More sharing options...
Adamphillip Posted August 18, 2014 Author Share Posted August 18, 2014 getting boards ready to install in the loft, just had a massive clear up, had to switch the curved points for normal points Link to post Share on other sites More sharing options...
Adamphillip Posted August 24, 2014 Author Share Posted August 24, 2014 first set of boards in and half the track laid going down the minimal approach, there will be a retaining wall as the background and 2 road bridges over the tracks on over the station and another over the narrow point area Link to post Share on other sites More sharing options...
Intercity 125 Posted August 30, 2014 Share Posted August 30, 2014 Looks just my sort of thing, following with interest. EDIT: And we have very similar layout names! (Axbridge and Ashbridge) Link to post Share on other sites More sharing options...
Adamphillip Posted September 9, 2014 Author Share Posted September 9, 2014 Looks just my sort of thing, following with interest. EDIT: And we have very similar layout names! (Axbridge and Ashbridge) thanks axbridge was my last OO layout that this on stemmed from this layout I'm also planning on doing something a bit funny by building a 4-5ft long bridge from maccano on a diagonal to the station end just for laughs and to see if it'd work, recently I've started work on a trackplan for a loco depo that'll sit on the other side of the loft with some DMU sidings Link to post Share on other sites More sharing options...
Adamphillip Posted October 2, 2014 Author Share Posted October 2, 2014 right 3/4 base boards are in just need more track Link to post Share on other sites More sharing options...
Adamphillip Posted October 3, 2014 Author Share Posted October 3, 2014 pictures with stories a railtour headed by DP2 pulls past the fright yard on it's why to kings cross via kings bridge the train is made up of a variety of mk1's including a pullman kitchen and a mk2 BSO totaling 6 coaches all in it's all go in the station as the rail-tour arrives and a class 37 pulls 2 MOD land-rovers on flatbeds and a queen Mary brake van while 2 class 91's sit idle in the platforms, a 108 DMU awaiting the all clear to head out to other parts of London Link to post Share on other sites More sharing options...
Recommended Posts
Archived
This topic is now archived and is closed to further replies.