Getting to the Point
A while ago I bought, amongst other things, a couple of Waverley O gauge point kits from Ian Morton.
Following a succesful test build of a Scalescenes Waiting Shelter blown up to O gauge a seed of an idea for my first layout in 7mm started to grow ...
So, the premise is a preserved railway somewhere in GWR land (as the point kits are to GWR standards). A single track railway doubled at the station. Model half the station with the overbridge forming the scenic break at one end and a tunnel at the other. The waiting shelter could stand on one platform with a small station building on the other.
Here's the shelter
and here's the point - a left hand A4, my first ever soldered point and not too shabby even if I say so
The wing rail on the straight route needs adjusting as it's a bit tight between the two .....
Finally here's the Pug sat on some track at last B)
3 Comments
Recommended Comments
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now